{"id":667957,"date":"2024-11-06T03:19:20","date_gmt":"2024-11-06T03:19:20","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/sae-10012018\/"},"modified":"2024-11-06T03:19:20","modified_gmt":"2024-11-06T03:19:20","slug":"sae-10012018","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/sae\/sae-10012018\/","title":{"rendered":"SAE 1001:2018"},"content":{"rendered":"
\n
This standard is applicable to the engineering or the reengineering of:<\/div>\n
    \n
  1. \na<\/span><\/p>\n
    Commercial or non-commercial systems, or portions thereof;<\/div>\n<\/li>\n
  2. \nb<\/span><\/p>\n
    Any system, small or large, simple or complex, software-intensive or not, precedented or unprecedented;<\/div>\n<\/li>\n
  3. \nc<\/span><\/p>\n
    Systems made up of hardware, software, firmware, personnel, facilities, data, materials, services, techniques, or processes (or combinations thereof);<\/div>\n<\/li>\n
  4. \nd<\/span><\/p>\n
    A new system or a legacy system, or portions thereof.<\/div>\n<\/li>\n<\/ol>\n
    The requirements of this standard, or a designated subset, are intended to be applied by projects establishing policies and procedures for project implementation of the adopted process and process elements of this standard.<\/div>\n
    The requirements of this standard may be tailored as follows:<\/div>\n
      \n
    1. \na<\/span><\/p>\n
      Processes \u2013 Processes may be tailored to be applicable for a given type of project or system. For example, the System Utilization Processes typically don\u2019t apply for conceptual or prototype systems in the same manner as for full-volume production systems.<\/div>\n<\/li>\n
    2. \nb<\/span><\/p>\n
      Activities \u2013 Activities may be tailored to reflect the specific approach established by a project, where the modified Activities still achieve the intended Process Purpose and Process Outcomes.<\/div>\n<\/li>\n
    3. \nc<\/span><\/p>\n
      Tasks, Inputs, and Outputs \u2013 Tasks, Inputs, and Outputs may be tailored to reflect the specific approach or methods established by a project, including different life cycle approaches for a given project or system, where the modifications still achieve the intended purpose of the Activity.<\/div>\n<\/li>\n<\/ol>\n<\/div>\n","protected":false},"excerpt":{"rendered":"

      Integrated Project Processes for Engineering a System<\/b><\/p>\n\n\n\n\n
      Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
      SAE<\/b><\/a><\/td>\n2018-10-09<\/td>\n179<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":667974,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[22,88,2639],"product_tag":[],"class_list":{"0":"post-667957","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-22","7":"product_cat-03-100-40","8":"product_cat-sae","10":"first","11":"instock","12":"sold-individually","13":"shipping-taxable","14":"purchasable","15":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/667957","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/667974"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=667957"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=667957"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=667957"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}