{"id":438672,"date":"2024-10-20T08:04:49","date_gmt":"2024-10-20T08:04:49","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-2749-2023-2\/"},"modified":"2024-10-26T15:09:00","modified_gmt":"2024-10-26T15:09:00","slug":"ieee-2749-2023-2","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-2749-2023-2\/","title":{"rendered":"IEEE 2749-2023"},"content":{"rendered":"
New IEEE Standard – Active. The risk factors that should be considered for the planning, operation, and maintenance of the distribution network are presented in this recommended practice. The approaches and practices for risk identification and evaluation, including the identification of risk factors and events, classification of risk types, evaluation of equipment and network risks, as well as the grading, warning, prevention measures, dynamic tracking, and simulation of risks are also provided. This recommended practice can be applied to the operation risk evaluation and guides the planning, construction, and maintenance of conventional power systems, microgrids, and smart distribution networks with high penetration of distributed energy resources (DER), and flexible loads.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | IEEE Std 2749\u2122-2023 Front cover <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | Title page <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | Important Notices and Disclaimers Concerning IEEE Standards Documents <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Participants <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 1.\u2002Overview 1.1\u2002Scope 1.2\u2002Purpose 1.3\u2002Word usage <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 1.4\u2002Limitations 1.5\u2002Technology status and schema <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 2.\u2002Definitions, acronyms, and abbreviations 2.1\u2002Definitions <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 2.2\u2002Acronyms and abbreviations 3.\u2002Risk identification 3.1\u2002Purpose of risk identification 3.2\u2002Content of risk identification 3.3\u2002Method of risk identification <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 3.4\u2002Time scale of risk identification 3.5\u2002Recommended methods for identifying typical risks <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 4.\u2002Risk evaluation 4.1\u2002Purposes and principles of risk evaluation 4.2\u2002Contents of risk evaluation <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 4.3\u2002Equipment-level risk evaluation <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 4.4\u2002System-level risk evaluation <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 4.5\u2002System risk evaluation under power electronic conditions <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | 5.\u2002Risk warning 5.1\u2002Purpose of risk warning 5.2\u2002Contents of risk warning <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 5.3\u2002Release of risk warning <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 6.\u2002Risk simulation 6.1\u2002Purpose and importance of risk simulation <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 6.2\u2002Models of risk simulation 6.3\u2002Contents of risk simulation <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | Annex\u00a0A (informative) Common methods for equipment-level risk identification in a distribution system A.1\u2002Neural network method A.2\u2002Big data clustering method A.3\u2002Classifier algorithm <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | Annex\u00a0B (informative) Common methods for system-level risk identification in a distribution system B.1\u2002Failure mode and effect analysis method B.2\u2002Fault tree method B.3\u2002Statistical analysis B.4\u2002Monte Carlo method <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | Annex\u00a0C (informative) Calculation of equipment failure rate C.1\u2002Calculation method C.2\u2002Calculation steps <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | Annex\u00a0D (informative) Referential methods and steps for system risks calculation D.1\u2002Using analytical method: D.1\u2002Using simulation method D.2\u2002Using power flow method <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | Annex\u00a0E (informative) Notes to the risk identification and evaluation for smart power distribution system E.1\u2002Risk identification of smart distribution system E.2\u2002Risk evaluation of smart distribution network <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | E.3\u2002Risk warning of smart distribution network E.4\u2002Risk simulation of smart power distribution system <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | Annex\u00a0F (informative) Bibliography <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | Back cover <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Recommended Practice for Risk Identification and Evaluation of Smart Power Distribution System (Approved Draft)<\/b><\/p>\n |