{"id":356538,"date":"2024-10-20T01:12:53","date_gmt":"2024-10-20T01:12:53","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-pd-cen-ts-154722016\/"},"modified":"2024-10-26T01:36:23","modified_gmt":"2024-10-26T01:36:23","slug":"bsi-pd-cen-ts-154722016","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-pd-cen-ts-154722016\/","title":{"rendered":"BSI PD CEN\/TS 15472:2016"},"content":{"rendered":"

Method for measurement of parcel transit time for cross-border parcels is mainly from an e-merchant perspective, especially for small and medium-sized companies. Based on an earlier study, the method will be based on events of the track and trace process.<\/p>\n

Events used need to be kept simple and transparent for the measurement of the complex matrix of the flows between European countries.<\/p>\n

The last part of the process (delivery options) is dependent on the country and on its historical development of postal and logistic operators – this part of the logistics process is currently too complex for simple measurement. Therefore the Technical Specification (TS) will focus on the main part of the process: from entrance (hand over) in the logistics chain to the first attempt of delivery.<\/p>\n

The Technical Specification should:<\/p>\n