{"id":313222,"date":"2024-10-19T21:33:30","date_gmt":"2024-10-19T21:33:30","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-iso-112952017-tc\/"},"modified":"2024-10-25T19:37:47","modified_gmt":"2024-10-25T19:37:47","slug":"bs-en-iso-112952017-tc","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-iso-112952017-tc\/","title":{"rendered":"BS EN ISO 11295:2017 – TC"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
82<\/td>\n | undefined <\/td>\n<\/tr>\n | ||||||
87<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
88<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
89<\/td>\n | 1 Scope 2 Normative references 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
93<\/td>\n | 4 Abbreviated terms <\/td>\n<\/tr>\n | ||||||
94<\/td>\n | 5 Classification of renovation and replacement techniques <\/td>\n<\/tr>\n | ||||||
95<\/td>\n | 6 Classification of renovation techniques 6.1 General 6.2 Lining with continuous pipes <\/td>\n<\/tr>\n | ||||||
97<\/td>\n | 6.3 Lining with close-fit pipes <\/td>\n<\/tr>\n | ||||||
99<\/td>\n | 6.4 Lining with cured-in-place pipes <\/td>\n<\/tr>\n | ||||||
102<\/td>\n | 6.5 Lining with discrete pipes <\/td>\n<\/tr>\n | ||||||
104<\/td>\n | 6.6 Lining with adhesive-backed hoses <\/td>\n<\/tr>\n | ||||||
106<\/td>\n | 6.7 Lining with spirally-wound pipes <\/td>\n<\/tr>\n | ||||||
108<\/td>\n | 6.8 Lining with pipe segments <\/td>\n<\/tr>\n | ||||||
110<\/td>\n | 6.9 Lining with a rigidly anchored plastics inner layer <\/td>\n<\/tr>\n | ||||||
111<\/td>\n | 6.10 Lining with sprayed polymeric materials <\/td>\n<\/tr>\n | ||||||
113<\/td>\n | 6.11 Lining with inserted hoses <\/td>\n<\/tr>\n | ||||||
114<\/td>\n | 7 Classification of trenchless replacement techniques 7.1 General 7.2 Pipe bursting <\/td>\n<\/tr>\n | ||||||
117<\/td>\n | 7.3 Pipe removal 7.3.1 General 7.3.2 Pipe eating 7.3.3 Pipe extraction <\/td>\n<\/tr>\n | ||||||
119<\/td>\n | 7.4 Horizontal directional drilling \u2014 HDD <\/td>\n<\/tr>\n | ||||||
122<\/td>\n | 7.5 Impact moling <\/td>\n<\/tr>\n | ||||||
123<\/td>\n | 7.6 Pipe jacking 7.6.1 General 7.6.2 Auger boring <\/td>\n<\/tr>\n | ||||||
124<\/td>\n | 7.6.3 Microtunnelling <\/td>\n<\/tr>\n | ||||||
126<\/td>\n | 8 Information on design 8.1 General 8.2 Condition assessment 8.2.1 General <\/td>\n<\/tr>\n | ||||||
127<\/td>\n | 8.2.2 Pipeline condition affecting functional performance <\/td>\n<\/tr>\n | ||||||
128<\/td>\n | 8.2.3 Site conditions affecting design 8.3 System functions 8.3.1 Renovation <\/td>\n<\/tr>\n | ||||||
129<\/td>\n | 8.3.2 Replacement 8.4 Performance criteria 8.4.1 Structural performance <\/td>\n<\/tr>\n | ||||||
133<\/td>\n | 8.4.2 Hydraulic performance 8.5 Other factors affecting technique family selection <\/td>\n<\/tr>\n | ||||||
134<\/td>\n | 9 Aspects affecting installation 9.1 Site conditions affecting installation 9.1.1 Working space requirements 9.1.2 Environmental impact <\/td>\n<\/tr>\n | ||||||
135<\/td>\n | 9.1.3 Assessment of site conditions 9.2 Work preparatory for installation 9.2.1 General 9.2.2 Location of existing pipeline system <\/td>\n<\/tr>\n | ||||||
136<\/td>\n | 9.2.3 Dimensions of existing pipeline system 9.2.4 Provision for maintenance of pipeline service 9.2.5 Preparation of existing pipeline <\/td>\n<\/tr>\n | ||||||
137<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Tracked Changes. Classification and information on design and applications of plastics piping systems used for renovation and replacement<\/b><\/p>\n |