{"id":161067,"date":"2024-10-19T09:40:29","date_gmt":"2024-10-19T09:40:29","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/aci-548-14-14\/"},"modified":"2024-10-25T01:59:03","modified_gmt":"2024-10-25T01:59:03","slug":"aci-548-14-14","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/aci\/aci-548-14-14\/","title":{"rendered":"ACI 548.14 14"},"content":{"rendered":"

This specification describes the work of repairing defects in hardened portland cement concrete with an epoxy mortar. Included are controls for epoxy resin system labeling, storage, handling, surface evaluation and preparation, mixing and application, inspection, quality control, and testing. Keywords: adhesion to concrete; aggregate; concrete construction; epoxy; hardened concrete; epoxy mortar; quality control; repairs; resurfacing.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
4<\/td>\nPART 1\u2014GENERAL
PART 1\u2014GENERAL
1.1\u2014Scope
1.1\u2014Scope
1.2\u2014Interpretation
1.2\u2014Interpretation
1.3\u2014Definitions
1.3\u2014Definitions
1.4\u2014Referenced standards
1.4\u2014Referenced standards
1.5\u2014Submittals
1.5\u2014Submittals
1.6\u2014Product delivery, storage, and handling
1.6\u2014Product delivery, storage, and handling <\/td>\n<\/tr>\n
5<\/td>\n1.7\u2014Project conditions
1.7\u2014Project conditions
PART 2\u2014PRODUCTS
PART 2\u2014PRODUCTS
2.1\u2014Materials
2.1\u2014Materials
PART 3\u2014EXECUTION
PART 3\u2014EXECUTION
3.1\u2014Preparation
3.1\u2014Preparation
3.2\u2014Inspection of surface prior to epoxy mortar application
3.2\u2014Inspection of surface prior to epoxy mortar application
3.3\u2014Epoxy mortar mixtures
3.3\u2014Epoxy mortar mixtures
3.4\u2014Epoxy mortar application
3.4\u2014Epoxy mortar application
3.5\u2014Field quality control
3.5\u2014Field quality control
3.6\u2014Cleanup
3.6\u2014Cleanup <\/td>\n<\/tr>\n
6<\/td>\n3.7\u2014Safety
3.7\u2014Safety
NOTES TO SPECIFIER
NOTES TO SPECIFIER
General notes
General notes
FOREWORD TO CHECKLISTS
FOREWORD TO CHECKLISTS <\/td>\n<\/tr>\n
7<\/td>\nMANDATORY REQUIREMENTS CHECKLIST
MANDATORY REQUIREMENTS CHECKLIST
OPTIONAL REQUIREMENTS CHECKLIST
OPTIONAL REQUIREMENTS CHECKLIST <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

548.14-14 Specification for Repairing Concrete with Epoxy Mortar<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
ACI<\/b><\/a><\/td>\n2015<\/td>\n12<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":161069,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2650],"product_tag":[],"class_list":{"0":"post-161067","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-aci","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/161067","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/161069"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=161067"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=161067"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=161067"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}