Shopping Cart

No products in the cart.

AISI S202 2020

$13.00

AISI S202-20: Code of Standard Practice for Cold-Formed Steel Structural Framing, 2020 Edition

Published By Publication Date Number of Pages
AISI 2020 44
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

None

PDF Catalog

PDF Pages PDF Title
3 DISCLAIMER
4 PREFACE
10 A. GENERAL
A1 Scope
A2 Definitions
15 A3 Referenced Documents
A4 Responsibility for Identifying Construction Documents
16 A5 Responsibility for Design
18 B. CLASSIFICATION OF MATERIALS
B1 Definition of Cold-Formed Steel Structural Framing
B2 Other Items
20 C. CONSTRUCTION DOCUMENTS
C1 Responsibilities
C2 Limit of Responsibility
21 C3 Jurisdiction
C4 Discrepancies or Omissions
C5 Revisions
23 D. INSTALLATION DOCUMENTS
D1 Owner Responsibility
24 D2 Component Manufacturer and Installer Responsibility
D3 Review Process
25 D4 General Responsibility
26 E. MATERIALS
E1 Structural Members
E2 Fasteners and Connection Hardware
E3 Preparation of Material
E4 Member Identification
E5 Special Marking
E6 Camber
27 F. INSTALLATION
F1 Scope
F2 Site Conditions
F3 Delivery, Handling and Storage of Materials
28 F4 Field Modifications and Repairs
F5 Installation Tolerances
F6 Temporary Bracing
30 G. QUALITY CONTROL
G1 General
G2 Material Inspection
31 H. CONTRACTUAL RELATIONS
H1 Construction Documents and Contracts
H2 Presentation of Proposals
H3 Acceptance of Proposals
H4 Terms of Payment
H5 The RFI Process
32 H6 Revisions to the Construction Documents and Contract
H7 Change Orders
H8 Contract Price Adjustment
H9 Scheduling
33 I. PRACTICES SPECIFIC TO CFS COMPONENT ASSEMBLIES
I1 Truss Responsibilities
I1.1 Design of Trusses
I1.2 Responsibilities of Truss Design Engineer/Truss Designer
I1.2.1 Preparation of Truss Design Drawings
I1.2.1.1 Truss Design Engineer
I1.2.1.2 Truss Designer
I1.2.2 Truss Design Criteria, Assumptions and Calculations
I1.2.3 Truss Design Drawings
34 I1.2.4 Truss Design Drawings Seal and Signature
I1.3 Responsibilities of Truss Manufacturer
I1.3.1 Truss Design Criteria and Requirements
35 I1.3.2 Communication to Truss Design Engineer
I1.3.3 Truss Placement Diagram or Model
I1.3.4 Truss Submittal Package
I1.3.5 Reliance on Construction Documents
I1.4 Responsibilities of Building Designer
I1.4.1 Preparation of Construction Documents
I1.4.2 Deferred Submittals
I1.4.3 Review Submittal Packages
I1.4.4 Required Information in Construction Documents
37 I1.4.5 Permanent Individual Truss Member Restraint/Bracing
I1.5 Responsibilities of Contractor
I1.5.1 Information Provided to Truss Manufacturer
I1.5.2 Information Provided to Building Designer
I1.5.3 Truss Submittal Package Review
I1.5.4 Means and Methods
I1.5.5 Truss Installation
I1.5.6 Alterations to Trusses
38 I1.6 Design of Permanent Individual Truss Member Restraint/Bracing
I2 Wall Panel Responsibilities
I2.1 Responsibilities of Wall Panel Detailer
I2.1.1 Wall Panel Fabrication Documents
39 I2.1.2 Wall Panel Placement Diagram
I2.1.3 Reliance on Construction Documents
I2.2 Responsibilities of Wall Panel Manufacturer
I2.2.1 Coordination with Wall Panel Detailer and Wall Panel Installer
I2.2.2 Wall Panel Submittal Package
I2.2.3 Reliance on Construction Documents
I2.3 Responsibilities of Wall Panel Installer
40 I2.4 Responsibilities of Contractor
I2.4.1 Information Provided to Wall Panel Manufacturer
I2.4.2 Means and Methods
I2.4.3 Wall Panel Installation
I2.4.4 Alterations to Wall Panels
41 J. PRACTICES SPECIFIC TO COORDINATION OF CFS STRUCTURAL FRAMING WITH OTHER TRADES AND MATERIALS
J1 Steel Floor and Roof Deck
J1.1 Responsibility of Building Designer
J1.1.1 Design Responsibility
J1.1.2 Required Information in Construction Documents
42 J1.1.3 Review Steel Deck Submittal Packages
J1.2 Responsibility of Steel Deck Support Framing Designers
J1.3 Responsibility of Steel Deck Supplier
J1.4 Responsibility of Contractor
AISI S202 2020
$13.00