3 | DISCLAIMER |
4 | PREFACE |
10 | A. GENERAL A1 Scope A2 Definitions |
15 | A3 Referenced Documents A4 Responsibility for Identifying Construction Documents |
16 | A5 Responsibility for Design |
18 | B. CLASSIFICATION OF MATERIALS B1 Definition of Cold-Formed Steel Structural Framing B2 Other Items |
20 | C. CONSTRUCTION DOCUMENTS C1 Responsibilities C2 Limit of Responsibility |
21 | C3 Jurisdiction C4 Discrepancies or Omissions C5 Revisions |
23 | D. INSTALLATION DOCUMENTS D1 Owner Responsibility |
24 | D2 Component Manufacturer and Installer Responsibility D3 Review Process |
25 | D4 General Responsibility |
26 | E. MATERIALS E1 Structural Members E2 Fasteners and Connection Hardware E3 Preparation of Material E4 Member Identification E5 Special Marking E6 Camber |
27 | F. INSTALLATION F1 Scope F2 Site Conditions F3 Delivery, Handling and Storage of Materials |
28 | F4 Field Modifications and Repairs F5 Installation Tolerances F6 Temporary Bracing |
30 | G. QUALITY CONTROL G1 General G2 Material Inspection |
31 | H. CONTRACTUAL RELATIONS H1 Construction Documents and Contracts H2 Presentation of Proposals H3 Acceptance of Proposals H4 Terms of Payment H5 The RFI Process |
32 | H6 Revisions to the Construction Documents and Contract H7 Change Orders H8 Contract Price Adjustment H9 Scheduling |
33 | I. PRACTICES SPECIFIC TO CFS COMPONENT ASSEMBLIES I1 Truss Responsibilities I1.1 Design of Trusses I1.2 Responsibilities of Truss Design Engineer/Truss Designer I1.2.1 Preparation of Truss Design Drawings I1.2.1.1 Truss Design Engineer I1.2.1.2 Truss Designer I1.2.2 Truss Design Criteria, Assumptions and Calculations I1.2.3 Truss Design Drawings |
34 | I1.2.4 Truss Design Drawings Seal and Signature I1.3 Responsibilities of Truss Manufacturer I1.3.1 Truss Design Criteria and Requirements |
35 | I1.3.2 Communication to Truss Design Engineer I1.3.3 Truss Placement Diagram or Model I1.3.4 Truss Submittal Package I1.3.5 Reliance on Construction Documents I1.4 Responsibilities of Building Designer I1.4.1 Preparation of Construction Documents I1.4.2 Deferred Submittals I1.4.3 Review Submittal Packages I1.4.4 Required Information in Construction Documents |
37 | I1.4.5 Permanent Individual Truss Member Restraint/Bracing I1.5 Responsibilities of Contractor I1.5.1 Information Provided to Truss Manufacturer I1.5.2 Information Provided to Building Designer I1.5.3 Truss Submittal Package Review I1.5.4 Means and Methods I1.5.5 Truss Installation I1.5.6 Alterations to Trusses |
38 | I1.6 Design of Permanent Individual Truss Member Restraint/Bracing I2 Wall Panel Responsibilities I2.1 Responsibilities of Wall Panel Detailer I2.1.1 Wall Panel Fabrication Documents |
39 | I2.1.2 Wall Panel Placement Diagram I2.1.3 Reliance on Construction Documents I2.2 Responsibilities of Wall Panel Manufacturer I2.2.1 Coordination with Wall Panel Detailer and Wall Panel Installer I2.2.2 Wall Panel Submittal Package I2.2.3 Reliance on Construction Documents I2.3 Responsibilities of Wall Panel Installer |
40 | I2.4 Responsibilities of Contractor I2.4.1 Information Provided to Wall Panel Manufacturer I2.4.2 Means and Methods I2.4.3 Wall Panel Installation I2.4.4 Alterations to Wall Panels |
41 | J. PRACTICES SPECIFIC TO COORDINATION OF CFS STRUCTURAL FRAMING WITH OTHER TRADES AND MATERIALS J1 Steel Floor and Roof Deck J1.1 Responsibility of Building Designer J1.1.1 Design Responsibility J1.1.2 Required Information in Construction Documents |
42 | J1.1.3 Review Steel Deck Submittal Packages J1.2 Responsibility of Steel Deck Support Framing Designers J1.3 Responsibility of Steel Deck Supplier J1.4 Responsibility of Contractor |