{"id":79572,"date":"2024-10-17T18:35:46","date_gmt":"2024-10-17T18:35:46","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-1017-2005\/"},"modified":"2024-10-24T19:40:34","modified_gmt":"2024-10-24T19:40:34","slug":"ieee-1017-2005","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-1017-2005\/","title":{"rendered":"IEEE 1017 2005"},"content":{"rendered":"

Revision Standard – Active. Revision of IEEE Std 1017-1991 Procedures and test voltage values for acceptance and maintenance testing of electrical submersible pump (ESP) cable systems are presented. This recommended practice applies to cable systems rated 3 kV and 5 kV (phase to phase) and is intended only for this special-purpose cable. The intent is to provide uniform test procedures and guidelines for evaluation of the test results.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\nFront Cover
\n <\/td>\n<\/tr>\n
5<\/td>\nIntroduction
Notice to users
Participants <\/td>\n<\/tr>\n
7<\/td>\nContents <\/td>\n<\/tr>\n
9<\/td>\nIEEE Recommended Practice for Field Testing Electric Submersible Pump Cable
1. Overview
1.1 Scope <\/td>\n<\/tr>\n
10<\/td>\n1.2 Purpose
2. Normative references
3. Definitions
3.1 absorption current: Current resulting from charge absorbed into the dielectric as a result of… <\/td>\n<\/tr>\n
11<\/td>\n3.2 ac test: This test is performed by the manufacturer as a pass\/fail test to ensure the electri…
3.3 acceptance test: This test is intended to detect damage before the initial installation of ne…
3.4 capacitance current: Current required to charge the capacitor formed by the dielectric of the…
3.5 dc test: This test is performed by the manufacturer to ensure the electrical integrity of the…
3.6 electric submersible pumps (ESPs): Equipment that refers to electric-driven, deep-well centri… <\/td>\n<\/tr>\n
12<\/td>\n3.7 ESP cable: Three-conductor power cable is installed in the well for the purpose of transmitti…
3.8 factory test: This test is completed by the manufacture at the 100% level. This voltage test …
3.9 field: This term or the term \u201cin the field\u201d\u009d may include cable not yet installed or cable that…
3.10 insulation resistance (IR): The opposition to current flow through the insulation.
3.11 insulation resistance test: By impressing a dc voltage across the insulation, a leakage curr…
3.12 leakage current (conductance): Current resulting from leakage through the cable insulating m…
3.13 maintenance test: This test is made after removing the cable from a well and is normally per…
3.14 motor lead extension cable: Three-conductor cable normally designed with a high-temperature\/…
3.15 rated voltage: This term is expressed for phase-to-phase voltage of a three-phase system.
3.16 surface connection cable: Power cable connecting the ESP cable to surface equipment. Sometim… <\/td>\n<\/tr>\n
13<\/td>\n4. Safety
4.1 Description
4.2 Application
4.3 Procedures to secure cable and area <\/td>\n<\/tr>\n
14<\/td>\n5. General considerations
5.1 Environmental influences
5.2 Test equipment <\/td>\n<\/tr>\n
15<\/td>\n5.3 Equipment setup
5.4 Special fault-locating test equipment
5.5 Equipment maintenance <\/td>\n<\/tr>\n
16<\/td>\n6. DC high-pot test methods
6.1 Precautions
6.2 Procedures <\/td>\n<\/tr>\n
21<\/td>\n7. Evaluation of dc high-pot test results
7.1 Current-time relationship
7.2 Interpretation <\/td>\n<\/tr>\n
24<\/td>\n7.3 Dielectric failure
7.4 Current comparison <\/td>\n<\/tr>\n
25<\/td>\n8. Conductor resistivity and continuity tests
9. Mechanical integrity
10. Testing of surface feedthroughs and connections
10.1 Description <\/td>\n<\/tr>\n
26<\/td>\n10.2 Wellhead with feedthrough
10.3 Wellhead with connections
10.4 Test procedure <\/td>\n<\/tr>\n
27<\/td>\n10.5 Visual inspection
10.6 Procedure <\/td>\n<\/tr>\n
28<\/td>\nAnnex A (informative) Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

IEEE Recommended Practice for Field Testing Electric Submersible Pump Cable<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
IEEE<\/b><\/a><\/td>\n2005<\/td>\n28<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":79573,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2644],"product_tag":[],"class_list":{"0":"post-79572","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-ieee","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/79572","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/79573"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=79572"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=79572"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=79572"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}