{"id":516018,"date":"2024-11-05T14:38:26","date_gmt":"2024-11-05T14:38:26","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/can-csa-iso-iec-ieee-24748-418\/"},"modified":"2024-11-05T14:38:26","modified_gmt":"2024-11-05T14:38:26","slug":"can-csa-iso-iec-ieee-24748-418","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/csa\/can-csa-iso-iec-ieee-24748-418\/","title":{"rendered":"CAN\/CSA-ISO\/IEC\/IEEE 24748-4:18"},"content":{"rendered":"
Preface<\/strong><\/p>\n Standards development within the Information Technology sector is harmonized with international standards development. Through the CSA Technical Committee on Information Technology (TCIT), Canadians serve as the SCC Mirror Committee (SMC) on ISO\/IEC Joint Technical Committee 1 on Information Technology (ISO\/IEC JTC1) for the Standards Council of Canada (SCC), the ISO member body for Canada and sponsor of the Canadian National Committee of the IEC. Also, as a member of the International Telecommunication Union (ITU), Canada participates in the International Telegraph and Telephone Consultative Committee (ITU-T). <\/p>\n Scope<\/strong><\/p>\n This part of ISO\/IEC\/IEEE 24748 <\/p>\n This part of ISO\/IEC\/IEEE 24748 is applicable to <\/p>\n In many organizations, the various responsibilities of technical management are assigned to more than one person. Where the term technical manager or systems engineering manager is used in this part of ISO\/IEC\/IEEE 24748, the guidance, advice or normative requirement applies to the applicable role within the project or organization. <\/p>\n This part of ISO\/IEC\/IEEE 24748 is intended to provide guidance for two-party situations and may be equally applied where the two parties are from the same organization. This part of ISO\/IEC\/IEEE 24748 can also be used by a single party as self-imposed tasks. <\/p>\n This part of ISO\/IEC\/IEEE 24748 can also serve as guidance in multi-party situations, where high risks are inherent in the supply and integration of complex systems, and procurement can involve several suppliers, organizations or parties.<\/p>\n","protected":false},"excerpt":{"rendered":" Systems and software engineering \u2014 Life cycle management \u2014 Part 4: Systems engineering planning<\/b><\/p>\n\n
\n
\n\n
\n Published By<\/td>\n Publication Date<\/td>\n Number of Pages<\/td>\n<\/tr>\n \n CSA<\/b><\/a><\/td>\n 2018-01-01<\/td>\n 84<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":516030,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[665,2674],"product_tag":[],"class_list":{"0":"post-516018","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-35-080","7":"product_cat-csa","9":"first","10":"instock","11":"sold-individually","12":"shipping-taxable","13":"purchasable","14":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/516018","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/516030"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=516018"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=516018"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=516018"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}