{"id":431549,"date":"2024-10-20T07:28:49","date_gmt":"2024-10-20T07:28:49","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bicsi-003-2014\/"},"modified":"2024-10-26T14:13:06","modified_gmt":"2024-10-26T14:13:06","slug":"bicsi-003-2014","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bicsi\/bicsi-003-2014\/","title":{"rendered":"BICSI 003 2014"},"content":{"rendered":"
The request and adoption of building information modeling (BIM) for information and communications technology (ICT) industry projects has been steadily increasing in recent years. Architectural, engineering, and construction firms all differ in what they require and ultimately provide their client. When combined with the varying levels of information provided by manufacturers that support all aspects of the construction industry, the result can be inefficiencies, frustration, and a failure to meet project expectations. BICSI 003 is the first BIM standard written specifically for communication and ICT. At its core, the new standard provides detailed information about BIM content models and object parameters, setting the recommended levels and guidelines for BIM models. Also contained are considerations about the integration of BIM within projects as well as identifying items within ICT that often enter into spatial conflicts with other areas of construction (e.g., electrical, mechanical).<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
6<\/td>\n | TABLE OF CONTENTS <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | INDEX OF FIGURES INDEX OF TABLES <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 1\u00a0\u00a0Introduction 1.1\u00a0\u00a0General 1.2\u00a0\u00a0Purpose 1.3\u00a0\u00a0Levels of Requirement 2\u00a0\u00a0Scope <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 3\u00a0\u00a0Required Standards and Documents <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 4\u00a0\u00a0Definitions, Acronyms, Abbreviations, and Units of Measurement 4.1\u00a0\u00a0Definitions <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 4.2\u00a0\u00a0Acronyms and Abbreviations 4.3\u00a0\u00a0Units of Measurement <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 5\u00a0\u00a0BIM Project Design 5.1\u00a0\u00a0Overview 5.2\u00a0\u00a0Pre-Schematic Design 5.3\u00a0\u00a0Schematic Design 5.4\u00a0\u00a0Design Development <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 5.5\u00a0\u00a0Bid Documents 5.6\u00a0\u00a0Construction Documents 5.7\u00a0\u00a0A\/E Contract Close-out 5.8\u00a0\u00a0Project Audit <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 6\u00a0\u00a0BIM Content Models 6.1\u00a0\u00a0Introduction 6.2\u00a0\u00a0Organization of Content <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 6.3\u00a0\u00a0Content Detail <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 6.4\u00a0\u00a0Hosting behavior <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 7\u00a0\u00a0Object Parameters 7.1\u00a0\u00a0Overview 7.2\u00a0\u00a0Naming and Identity Parameters <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | 7.3\u00a0\u00a0Shared Parameters and Shared Parameter Files <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | 7.4\u00a0\u00a0Global Object Parameters <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | 7.5\u00a0\u00a0Telecommunications Parameters <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | 8\u00a0\u00a0Information Technology Systems Considerations 8.1\u00a0\u00a0Overview 8.2\u00a0\u00a0Telecommunications Considerations <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | 8.3\u00a0\u00a0Electronic Safety and Security (ESS) Considerations <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | 8.4\u00a0\u00a0Data Center Considerations <\/td>\n<\/tr>\n | ||||||
54<\/td>\n | 8.5\u00a0\u00a0Building Automation System (BAS) Considerations <\/td>\n<\/tr>\n | ||||||
56<\/td>\n | Appendix A:\u00a0\u00a0Deploying BIM (Informative) A.1\u00a0\u00a0Overview A.2\u00a0\u00a0Implementation <\/td>\n<\/tr>\n | ||||||
60<\/td>\n | Appendix B:\u00a0\u00a0About BIM (Informative) B.1\u00a0\u00a0History and Current Industry Condition B.2\u00a0\u00a0Potential Benefits of BIM <\/td>\n<\/tr>\n | ||||||
62<\/td>\n | B.3\u00a0\u00a0Challenges <\/td>\n<\/tr>\n | ||||||
63<\/td>\n | B.4\u00a0\u00a0The \u201cInformation\u201d Within BIM <\/td>\n<\/tr>\n | ||||||
64<\/td>\n | B.5\u00a0\u00a0Integrated Project Delivery <\/td>\n<\/tr>\n | ||||||
66<\/td>\n | Appendix C:\u00a0\u00a0Related Documents (Informative) <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" ANSI\/BICSI 003-2014, Building Information Modeling (BIM) Practices for Information Technology Systems<\/b><\/p>\n |