{"id":255497,"date":"2024-10-19T16:53:25","date_gmt":"2024-10-19T16:53:25","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-iso-12405-42018\/"},"modified":"2024-10-25T12:21:17","modified_gmt":"2024-10-25T12:21:17","slug":"bs-iso-12405-42018","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-iso-12405-42018\/","title":{"rendered":"BS ISO 12405-4:2018"},"content":{"rendered":"

This document specifies test procedures for the basic characteristics of performance, reliability and electrical functionality for the battery packs and systems for either high-power or high-energy application. Unless otherwise stated, the test applies to both applications.<\/p>\n

\n

NOTE 1 Typical applications for high-power battery packs and systems are hybrid electric vehicles (HEVs) and some type of fuel cell vehicles (FCVs).<\/p>\n<\/blockquote>\n

\n

NOTE 2 Typical applications for high-energy battery packs and systems are battery electric vehicles (BEVs), plug-in hybrid electric vehicles (PHEVs) and some type of fuel cell vehicles (FCVs).<\/p>\n<\/blockquote>\n

\n

NOTE 3 Testing on cell level is specified in IEC 62660 series.<\/p>\n<\/blockquote>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
2<\/td>\nNational foreword <\/td>\n<\/tr>\n
7<\/td>\nForeword <\/td>\n<\/tr>\n
8<\/td>\nIntroduction <\/td>\n<\/tr>\n
9<\/td>\n1 Scope
2 Normative references
3 Terms and definitions <\/td>\n<\/tr>\n
12<\/td>\n4 Symbols and abbreviated terms
4.1 Symbols
4.2 Abbreviated terms <\/td>\n<\/tr>\n
14<\/td>\n5 General requirements
5.1 General conditions
5.1.1 Prerequisites
5.1.2 Accuracy of measurement equipment and measured values <\/td>\n<\/tr>\n
15<\/td>\n5.2 Test sequence plan
5.3 Tests
5.4 Preparation of battery pack and system for bench testing
5.4.1 Preparation of battery pack <\/td>\n<\/tr>\n
16<\/td>\n5.4.2 Preparation of battery system
6 General tests
6.1 Preconditioning cycles
6.1.1 Purpose
6.1.2 Test procedures <\/td>\n<\/tr>\n
17<\/td>\n6.2 Standard Cycle (SC)
6.2.1 Purpose
6.2.2 Test procedures <\/td>\n<\/tr>\n
18<\/td>\n7 Performance tests
7.1 Energy and capacity at RT
7.1.1 Purpose <\/td>\n<\/tr>\n
19<\/td>\n7.1.2 Test procedures <\/td>\n<\/tr>\n
20<\/td>\n7.1.3 Determination of rated capacity <\/td>\n<\/tr>\n
21<\/td>\n7.2 Energy and capacity at different temperatures and discharge rates
7.2.1 Purpose
7.2.2 Test procedure <\/td>\n<\/tr>\n
28<\/td>\n7.2.3 Requirements
7.3 Power and internal resistance
7.3.1 Purpose
7.3.2 Pulse power characterization profile <\/td>\n<\/tr>\n
35<\/td>\n7.3.3 Test procedure <\/td>\n<\/tr>\n
39<\/td>\n7.3.4 Requirements
7.4 No load SOC loss
7.4.1 Purpose <\/td>\n<\/tr>\n
40<\/td>\n7.4.2 Test procedure <\/td>\n<\/tr>\n
41<\/td>\n7.4.3 Test sequence <\/td>\n<\/tr>\n
43<\/td>\n7.4.4 Requirement
7.5 SOC loss at storage
7.5.1 Purpose
7.5.2 Test procedure <\/td>\n<\/tr>\n
44<\/td>\n7.5.3 Test sequence
7.5.4 Requirement <\/td>\n<\/tr>\n
45<\/td>\n7.6 Cranking power at low temperature
7.6.1 Purpose
7.6.2 Test procedure <\/td>\n<\/tr>\n
46<\/td>\n7.6.3 Requirement
7.7 Cranking power at high temperature
7.7.1 Purpose
7.7.2 Test procedure <\/td>\n<\/tr>\n
47<\/td>\n7.7.3 Requirement
7.8 Energy efficiency
7.8.1 Purpose <\/td>\n<\/tr>\n
48<\/td>\n7.8.2 Test description
7.8.3 Test procedure <\/td>\n<\/tr>\n
49<\/td>\n7.8.4 Requirement <\/td>\n<\/tr>\n
50<\/td>\n7.8.5 Calculation example for energy efficiency test
7.9 Energy efficiency at fast charging
7.9.1 Purpose
7.9.2 Test procedure <\/td>\n<\/tr>\n
52<\/td>\n7.9.3 Requirement
7.10 Cycle life
7.10.1 Purpose
7.10.2 Test procedure <\/td>\n<\/tr>\n
68<\/td>\n7.10.3 Requirement
7.10.4 Calculation example for cycle life test for high-power battery system <\/td>\n<\/tr>\n
70<\/td>\nAnnex A (informative) Battery pack and system and overview on tests <\/td>\n<\/tr>\n
75<\/td>\nAnnex B (informative) Examples of data sheets for battery pack and system testing <\/td>\n<\/tr>\n
79<\/td>\nAnnex C (informative) Example of test conditions <\/td>\n<\/tr>\n
80<\/td>\nBibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Electrically propelled road vehicles. Test specification for lithium-ion traction battery packs and systems – Performance testing<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
BSI<\/b><\/a><\/td>\n2018<\/td>\n82<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":255501,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2641],"product_tag":[],"class_list":{"0":"post-255497","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-bsi","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/255497","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/255501"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=255497"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=255497"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=255497"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}