{"id":197762,"date":"2024-10-19T12:35:19","date_gmt":"2024-10-19T12:35:19","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ashrae-guideline-1-4-2019\/"},"modified":"2024-10-25T05:08:51","modified_gmt":"2024-10-25T05:08:51","slug":"ashrae-guideline-1-4-2019","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ashrae\/ashrae-guideline-1-4-2019\/","title":{"rendered":"ASHRAE Guideline 1.4 2019"},"content":{"rendered":"

ASHRAE Guideline 1.4 provides procedures for producing a Systems Manual as a resource for training, operations, maintenance, and upgrading of facilities. Guideline 1.4 applies to information from planning, commissioning, design, construction, testing, and training activities, and operations planning for new, renovated, and existing facilities, equipment, and assemblies.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\nASHRAE Guideline 1.4-2019 <\/td>\n<\/tr>\n
3<\/td>\nCONTENTS <\/td>\n<\/tr>\n
4<\/td>\nFOREWORD
1. PURPOSE
2. SCOPE
3. DEFINITIONS
4. SYSTEMS MANUAL CONTENT AND ORGANIZATION
4.1 Introduction. The Systems Manual contains information on the Owner\u2019s initial and current facility and project requirements, and documentation of building design and construction, along with testing and training documentation, operational requir…
4.2 Systems Manual Content Preparation. The Systems Manual is intended to
4.3 Systems Manual Documentation Organization <\/td>\n<\/tr>\n
5<\/td>\n4.4 Sources and Content of the Documents in the Systems Manual <\/td>\n<\/tr>\n
6<\/td>\n5. USE OF THE SYSTEMS MANUAL
5.1 Introduction. The Systems Manual is the concise collection of design, construction, testing, and operations information, including updates and modifications to systems and assemblies as they occur during construction, renovation, and operation. F… <\/td>\n<\/tr>\n
7<\/td>\n5.2 The information contained in the Systems Manual is given by the project and CxP Teams to provide essential information needed by the O&M staff to understand, operate, and maintain the building\u2019s systems and assemblies, optimally operate the bui…
5.3 The necessary sections of the Systems Manual are used in the initial and subsequent training of the O&M staff and occupants.
5.4 The O&M staff uses the Systems Manual to document modifications they implement and the reasoning behind the modifications and improvements. It is also an assembly of needed information for modifications required to meet CFR that will guide modifi…
5.5 The Systems Manual is the assembly of institutional knowledge that records needed information for present operation and future modifications. It is also the history of modifications by all who contribute to the modifications that happen over the …
5.6 The information on the building systems as described in this guideline assumes that it is gathered and assembled as it becomes available during a construction or renovation project. This information may be arranged by building system when that is…
5.7 Production of the Systems Manual will depend on the directives in the OPR, the process of how the project is planned, designed and built, how it is to be operated, and the organization and application of the maintenance program. The responsibilit…
5.8 This guideline is supplemental to the Cx detailed in ANSI\/ASHRAE Standard 202 and ASHRAE Guideline 0 and should be used in conjunction with those and other applicable documents.
5.9 Sections 6 through 11 of this guideline provide guidance on the actions necessary to assemble, produce, utilize, and update the information in the Systems Manual at each stage of the project. The appendices provide examples of documentation and f…
5.10 To ensure compliance with the OPR, a compliance and approval process should exist for each stage of the development and revision of the Systems Manual. The Owner is ultimately responsible for the decisions and approvals on the formats, arrangeme…
6. PREDESIGN- AND PLANNING-PHASE FUNCTIONS
6.1 Introduction. During the new project Predesign Phase or existing facility commissioning (Cx) Planning Phase, the Owner defines the Systems Manual formats, interface requirements, and responsibilities. This should include development, assembly, an…
6.2 Predesign- and Planning-Phase Objectives. During this phase of Systems Manual development, objectives include the following.
6.3 System Manual Structure Requirements. During the Predesign or Planning Phase, the Owner should establish the structure, format, and expected source of documents that meets their project or organizational requirements. <\/td>\n<\/tr>\n
8<\/td>\n6.4 Roles and Responsibilities for Systems Manual Initial Documentation
6.5 Predesign- or Planning-Phase Systems Manual Content Requirements. The Owner documents in the OPR or CFR and by contract the responsibilities and deliverables of each team member in providing the content, documentation, assembly, training, utiliza…
6.6 Budgets. The Owner should include sufficient project funding and operational budgeting in the project and building operations budgets to develop, implement, and maintain the Systems Manual.
6.7 Planning- and Predesign-Phase Systems Manual Evaluation and Acceptance Criteria <\/td>\n<\/tr>\n
9<\/td>\n7. DESIGN- AND INVESTIGATION-PHASE FUNCTIONS
7.1 Introduction. During the Design Phase for new projects or the Investigation Phase of existing buildings, the Systems Manual requirements are inserted and detailed in the project requirements, documentation, and contracts. This information provide…
7.2 Design-Phase Systems-Manual Preparation Objectives. The Design Phase and Investigation and Design Phase objectives include the conversion of the Systems Manual requirements into contract requirements. This will instruct the contractors, suppliers…
7.3 Design-Phase Systems Manual Documentation Requirements for Specific Building or Project
7.4 Design-Phase Systems Manual Evaluation and Acceptance Criteria
8. CONSTRUCTION- AND IMPLEMENTATION-PHASE FUNCTIONS
8.1 Introduction. During the Construction Phase of a new building and the Implementation Phase of an existing building, the Systems Manual requirements are updated and implemented to provide the documents and assemble them for use in training and ope…
8.2 Construction-Phase Systems Manual Preparation Objectives
8.3 Construction and Implementation Phase Systems Manual Documentation Requirements <\/td>\n<\/tr>\n
10<\/td>\n8.4 Testing and Evaluation Documentation
8.5 Project Record Documents
8.6 Construction- and Implementation-Phase Systems Manual Evaluation and Acceptance Criteria
9. OCCUPANCY- AND OPERATIONS-PHASE FUNCTIONS
9.1 Introduction. During the occupancy and operation of a facility, the Systems Manual is utilized to assist in the operation and maintenance of the building. The documents are updated on a periodic basis and as needed to keep the Systems Manual current
9.2 Occupancy- and Operations-Phase Systems Manual Objectives
9.3 Occupancy- and Operations-Phase Systems Manual Documentation Requirements
9.4 Occupancy- and Operations-Phase Systems Manual Evaluation and Acceptance Criteria <\/td>\n<\/tr>\n
11<\/td>\n10. EXISTING-BUILDING FUNCTIONS
10.1 Introduction. For existing facility systems and projects, the plans and documentation sources often vary from new construction. The requirements for assembling a Systems Manual if it does not exist or updating an existing Systems Manual may requ…
10.2 Existing-Building Systems Manual Objectives
10.3 Existing-Building Systems Manual Documentation Requirements where no Systems Manual Presently Exists <\/td>\n<\/tr>\n
12<\/td>\n10.4 Existing-Building Systems Manual Evaluation and Acceptance Criteria
11. COMPUTERIZATION AND INTERFACE WITH OTHER PROGRAMS
11.1 Introduction. Even though a Systems Manual can be assembled in a hard copy format, it is usually better to digitize the information and assemble it into a computerized and searchable format. The volume of information is much easier to handle and…
11.2 Computerization and interface objectives include the following:
11.3 Computerization and Interface Documentation Requirements
11.4 Computerization and Interface Verification and Acceptance Criteria <\/td>\n<\/tr>\n
13<\/td>\nINFORMATIVE APPENDIX A: SYSTEMS MANUAL DOCUMENTATION FLOWCHART <\/td>\n<\/tr>\n
14<\/td>\nINFORMATIVE APPENDIX B: SYSTEMS MANUAL CONTRACT REQUIREMENTS
B1. Initiating the Process
B2. Setting Contractual Requirements <\/td>\n<\/tr>\n
15<\/td>\nINFORMATIVE APPENDIX C: ROLES AND RESPONSIBILITIES <\/td>\n<\/tr>\n
16<\/td>\nINFORMATIVE APPENDIX D: SYSTEMS MANUAL EXECUTIVE SUMMARY
Part I: Systems Manual EXECUTIVE SUMMARY
Part II: Facility Design and Construction
Part III: Facility Systems and Assemblies Information
Part IV: Facility Operations
Part V: Training
Part VI: Cx Progress Report <\/td>\n<\/tr>\n
17<\/td>\nINFORMATIVE APPENDIX E: OWNER’S PROJECT REQUIREMENTS AND CURRENT FACILITY REQUIREMENTS DOCUMENTS
E1. Owner\u2019s Project Requirements <\/td>\n<\/tr>\n
18<\/td>\nE2. Current Facility Requirements <\/td>\n<\/tr>\n
19<\/td>\nE3. Current Facility Requirements Outline Example <\/td>\n<\/tr>\n
21<\/td>\nINFORMATIVE APPENDIX F: COMMISSIONING PLAN <\/td>\n<\/tr>\n
23<\/td>\nINFORMATIVE APPENDIX G: BASIS OF DESIGN <\/td>\n<\/tr>\n
25<\/td>\nINFORMATIVE APPENDIX H: CONSTRUCTION PROJECT RECORD DOCUMENTS <\/td>\n<\/tr>\n
26<\/td>\nINFORMATIVE APPENDIX I: PROJECT DOCUMENTS AND SUBMITTAL REVIEW REPORTS
I1. Design Review Report <\/td>\n<\/tr>\n
27<\/td>\nI2. Submittal Review Report <\/td>\n<\/tr>\n
29<\/td>\nINFORMATIVE APPENDIX J: BUILDING AND EQUIPMENT SPECIFICATIONS
J1. Commissioning Specifications <\/td>\n<\/tr>\n
30<\/td>\nINFORMATIVE APPENDIX K: APPROVED SUBMITTALS <\/td>\n<\/tr>\n
31<\/td>\nINFORMATIVE APPENDIX L: MANUFACTURER\u2019S OPERATIONS AND MAINTENANCE DOCUMENTS <\/td>\n<\/tr>\n
32<\/td>\nINFORMATIVE APPENDIX M: WARRANTY INFORMATION <\/td>\n<\/tr>\n
33<\/td>\nINFORMATIVE APPENDIX N: CONTRACTOR AND SUPPLIER LISTING AND CONTACT INFORMATION <\/td>\n<\/tr>\n
34<\/td>\nINFORMATIVE APPENDIX O: FACILITY GUIDE
O1. Sources and Content of the Documents in the Facility Guide <\/td>\n<\/tr>\n
36<\/td>\nINFORMATIVE APPENDIX P FACILITY OPERATING PLAN <\/td>\n<\/tr>\n
37<\/td>\nINFORMATIVE APPENDIX Q: BUILDING OPERATING SEQUENCES AND SETPOINTS <\/td>\n<\/tr>\n
38<\/td>\nI. SCHEDULES
II. SETPOINTS (I-P) <\/td>\n<\/tr>\n
39<\/td>\nII. SETPOINTS (SI) <\/td>\n<\/tr>\n
40<\/td>\nIII. SEQUENCES OF OPERATION
SEQUENCE OF OPERATION
A. OCCUPIED MODE
B. UNOCCUPIED MODE
C. SAFETY SHUTDOWNS
SEQUENCE OF OPERATION
A. OCCUPIED MODE
B. UNOCCUPIED MODE <\/td>\n<\/tr>\n
41<\/td>\nC. SAFETY SHUTDOWNS
SEQUENCE OF OPERATION
A. OCCUPIED MODE
B. UNOCCUPIED MODE <\/td>\n<\/tr>\n
42<\/td>\nC. SAFETY SHUTDOWNS <\/td>\n<\/tr>\n
43<\/td>\nINFORMATIVE APPENDIX R: MAINTENANCE PLAN, PROCEDURES, CHECKLISTS, SCHEDULES, AND RECORDS
Table R-1 Example Building Systems List and Schedule <\/td>\n<\/tr>\n
44<\/td>\nTable R-2 Example for Building and HVAC Equipment Inspections <\/td>\n<\/tr>\n
46<\/td>\nINFORMATIVE APPENDIX S: ONGOING COMMISSIONING AND RECORDKEEPING
S1. GENERAL REQUIREMENTS\u2014 Scope, Purpose, Responsibility, Training, Security <\/td>\n<\/tr>\n
48<\/td>\nINFORMATIVE APPENDIX T: JANITORIAL AND CLEANING PLANS AND PROCEDURES
T1. CUSTODIAL PROCEDURES <\/td>\n<\/tr>\n
50<\/td>\nINFORMATIVE APPENDIX U: UTILITY MEASUREMENT AND REPORTING <\/td>\n<\/tr>\n
51<\/td>\nTable U-1 Description of Utility Metering and Monitoring Systems
Table U-2 Document Formats and Procedures for Tracking and Reporting Utility Use <\/td>\n<\/tr>\n
53<\/td>\nTable U-3 Sample Building (I-P) <\/td>\n<\/tr>\n
54<\/td>\nTable U-3 Sample Building (SI) <\/td>\n<\/tr>\n
56<\/td>\nTable U-4 Application of IPMVP <\/td>\n<\/tr>\n
59<\/td>\nINFORMATIVE APPENDIX V: USE OF SYSTEMS MANUAL IN TRAINING <\/td>\n<\/tr>\n
63<\/td>\nINFORMATIVE APPENDIX W: ISSUES AND RESOLUTION LOGS
W1. Issues and Resolutions Log <\/td>\n<\/tr>\n
64<\/td>\nINFORMATIVE APPENDIX X: CX REPORTS AND TESTING RECORDS
X1. Construction Observation and Testing Checklists and Report
X2. Cx REPORT <\/td>\n<\/tr>\n
66<\/td>\nINFORMATIVE APPENDIX Y: INDUSTRY RESOURCES <\/td>\n<\/tr>\n
67<\/td>\nINFORMATIVE APPENDIX Z: REFERENCES <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

ASHRAE Guideline 1.4-2019 – Preparing Systems Manuals for Facilities<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
ASHRAE<\/b><\/a><\/td>\n2019<\/td>\n70<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":197767,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2719],"product_tag":[],"class_list":{"0":"post-197762","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-ashrae","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/197762","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/197767"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=197762"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=197762"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=197762"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}