{"id":197673,"date":"2024-10-19T12:34:53","date_gmt":"2024-10-19T12:34:53","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ashrae-guideline-1-2-2019-spanish\/"},"modified":"2024-10-25T05:08:23","modified_gmt":"2024-10-25T05:08:23","slug":"ashrae-guideline-1-2-2019-spanish","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ashrae\/ashrae-guideline-1-2-2019-spanish\/","title":{"rendered":"ASHRAE Guideline 1.2 2019 SPANISH"},"content":{"rendered":"

This is a Spanish translation of Guideline 1.2, Technical Requirements for the Commissioning Process for Existing HVAC&R Systems and Assemblies.ASHRAE Guideline 1.2 provides requirements for the application of the Commissioning (Cx) Process described in ASHRAE Guideline 0.2 to existing heating, ventilating, air-conditioning, and refrigerating (HVAC&R) systems and assemblies.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\nASHRAE Directriz 1.2-2019, Requisitos T\u00e9cnicos del
\nProceso de Commissioning
\npara Sistemas e Instalaciones
\nExistentes de
\nClimatizaci\u00f3n y Refrigeraci\u00f3n <\/td>\n<\/tr>\n
5<\/td>\n\u00cdNDICE <\/td>\n<\/tr>\n
6<\/td>\nPR\u00d3LOGO
OBJETO
ALCANCE
DEFINICIONES Y ABREVIATURAS
DESCRIPCI\u00d3N DEL PROCESO <\/td>\n<\/tr>\n
7<\/td>\nPLANIFICACI\u00d3N DE CARTERA DE EDIFICIOS <\/td>\n<\/tr>\n
11<\/td>\nEVALUACI\u00d3N <\/td>\n<\/tr>\n
17<\/td>\nINSPECCI\u00d3N <\/td>\n<\/tr>\n
30<\/td>\nIMPLANTACI\u00d3N <\/td>\n<\/tr>\n
38<\/td>\nENTREGA <\/td>\n<\/tr>\n
40<\/td>\nCOMMISSIONING EN CONTINUO <\/td>\n<\/tr>\n
44<\/td>\nANEXO INFORMATIVO EMUESTRA DE SOLICITUD DEPROPUESTAS PARA UN PROYECTO EECx <\/td>\n<\/tr>\n
46<\/td>\nANEXO INFORMATIVO JREQUERIMIENTOS ACTUALES DEL EDIFICIO <\/td>\n<\/tr>\n
56<\/td>\nANEXO INFORMATIVO L2EJEMPLO DE INFORMEDE LA FASE DE INSPECCI\u00d3N <\/td>\n<\/tr>\n
84<\/td>\nBack Page <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

ASHRAE Spanish – Guideline 1.2-2019 — Technical Requirements for the Commissioning Process for Existing HVAC&R Systems and Assemblies<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
ASHRAE<\/b><\/a><\/td>\n2019<\/td>\n84<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":197676,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2719],"product_tag":[],"class_list":{"0":"post-197673","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-ashrae","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/197673","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/197676"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=197673"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=197673"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=197673"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}