{"id":189192,"date":"2024-10-19T11:55:10","date_gmt":"2024-10-19T11:55:10","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/asce-electricaltransmissionubstationstructures-2018\/"},"modified":"2024-10-25T04:22:15","modified_gmt":"2024-10-25T04:22:15","slug":"asce-electricaltransmissionubstationstructures-2018","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/asce\/asce-electricaltransmissionubstationstructures-2018\/","title":{"rendered":"ASCE ElectricalTransmissionubstationStructures 2018"},"content":{"rendered":"
Proceedings of the Electrical Transmission and Substation Structures Conference 2018, held in Atlanta, Georgia, November 4\u20138, 2018. Sponsored by the Structural Engineering Institute of ASCE.<\/p>\n
This collection contains 46 peer-reviewed papers on transmission line and substation structures and foundation construction issues.<\/p>\n
Topics include: structural analysis; foundations; structural failure analysis and investigation; substation design issues; seismic and special design considerations; structure upgrading; and construction challenges.<\/p>\n
This proceedings will provide up-to-date information to engineers, contractors, suppliers, and consultants in the electrical transmission industry.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | 9780784481837.fm.pdf fm.pdf Final p i Title ETS 2018.pdf <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | Final p ii Notices ETS 2018.pdf <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | Final p iii-v Preface and Acknowledgments ETS 2018.pdf <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | toc.pdf <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 9780784481837.001.pdf <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 9780784481837.002.pdf <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | 9780784481837.003.pdf <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | 9780784481837.004.pdf <\/td>\n<\/tr>\n | ||||||
57<\/td>\n | 9780784481837.005.pdf <\/td>\n<\/tr>\n | ||||||
72<\/td>\n | 9780784481837.006.pdf <\/td>\n<\/tr>\n | ||||||
80<\/td>\n | 9780784481837.007.pdf <\/td>\n<\/tr>\n | ||||||
94<\/td>\n | 9780784481837.008.pdf <\/td>\n<\/tr>\n | ||||||
104<\/td>\n | 9780784481837.009.pdf <\/td>\n<\/tr>\n | ||||||
118<\/td>\n | 9780784481837.010.pdf <\/td>\n<\/tr>\n | ||||||
132<\/td>\n | 9780784481837.011.pdf <\/td>\n<\/tr>\n | ||||||
142<\/td>\n | 9780784481837.012.pdf <\/td>\n<\/tr>\n | ||||||
156<\/td>\n | 9780784481837.013.pdf <\/td>\n<\/tr>\n | ||||||
167<\/td>\n | 9780784481837.014.pdf <\/td>\n<\/tr>\n | ||||||
177<\/td>\n | 9780784481837.015.pdf <\/td>\n<\/tr>\n | ||||||
186<\/td>\n | 9780784481837.016.pdf <\/td>\n<\/tr>\n | ||||||
195<\/td>\n | 9780784481837.017.pdf <\/td>\n<\/tr>\n | ||||||
201<\/td>\n | 9780784481837.018.pdf <\/td>\n<\/tr>\n | ||||||
209<\/td>\n | 9780784481837.019.pdf <\/td>\n<\/tr>\n | ||||||
219<\/td>\n | 9780784481837.020.pdf <\/td>\n<\/tr>\n | ||||||
229<\/td>\n | 9780784481837.021.pdf <\/td>\n<\/tr>\n | ||||||
243<\/td>\n | 9780784481837.022.pdf <\/td>\n<\/tr>\n | ||||||
254<\/td>\n | 9780784481837.023.pdf <\/td>\n<\/tr>\n | ||||||
267<\/td>\n | 9780784481837.024.pdf <\/td>\n<\/tr>\n | ||||||
279<\/td>\n | 9780784481837.025.pdf <\/td>\n<\/tr>\n | ||||||
291<\/td>\n | 9780784481837.026.pdf <\/td>\n<\/tr>\n | ||||||
300<\/td>\n | 9780784481837.027.pdf <\/td>\n<\/tr>\n | ||||||
312<\/td>\n | 9780784481837.028.pdf <\/td>\n<\/tr>\n | ||||||
322<\/td>\n | 9780784481837.029.pdf <\/td>\n<\/tr>\n | ||||||
335<\/td>\n | 9780784481837.030.pdf <\/td>\n<\/tr>\n | ||||||
347<\/td>\n | 9780784481837.031.pdf <\/td>\n<\/tr>\n | ||||||
359<\/td>\n | 9780784481837.032.pdf <\/td>\n<\/tr>\n | ||||||
372<\/td>\n | 9780784481837.033.pdf <\/td>\n<\/tr>\n | ||||||
382<\/td>\n | 9780784481837.034.pdf <\/td>\n<\/tr>\n | ||||||
395<\/td>\n | 9780784481837.035.pdf <\/td>\n<\/tr>\n | ||||||
403<\/td>\n | 9780784481837.036.pdf <\/td>\n<\/tr>\n | ||||||
417<\/td>\n | 9780784481837.037.pdf <\/td>\n<\/tr>\n | ||||||
429<\/td>\n | 9780784481837.038.pdf <\/td>\n<\/tr>\n | ||||||
445<\/td>\n | 9780784481837.039.pdf <\/td>\n<\/tr>\n | ||||||
455<\/td>\n | 9780784481837.040.pdf <\/td>\n<\/tr>\n | ||||||
468<\/td>\n | 9780784481837.041.pdf <\/td>\n<\/tr>\n | ||||||
482<\/td>\n | 9780784481837.042.pdf <\/td>\n<\/tr>\n | ||||||
494<\/td>\n | 9780784481837.043.pdf <\/td>\n<\/tr>\n | ||||||
506<\/td>\n | 9780784481837.044.pdf <\/td>\n<\/tr>\n | ||||||
516<\/td>\n | 9780784481837.045.pdf <\/td>\n<\/tr>\n | ||||||
529<\/td>\n | 9780784481837.046.pdf <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Electrical Transmission and Substation Structures 2018-Dedicated to Strengthening our Critical Infrastructure<\/b><\/p>\n |