{"id":186312,"date":"2024-10-19T11:41:51","date_gmt":"2024-10-19T11:41:51","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ashrae-guideline-1-3-2018\/"},"modified":"2024-10-25T04:06:01","modified_gmt":"2024-10-25T04:06:01","slug":"ashrae-guideline-1-3-2018","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ashrae\/ashrae-guideline-1-3-2018\/","title":{"rendered":"ASHRAE Guideline 1.3 2018"},"content":{"rendered":"
Guideline 1.3 provides methodologiesand formats for developing training plans, conducting training programs, anddocumenting training results for the operation and maintenance of buildingHVAC&R systems during the Commissioning (Cx) Process. In addition to offering immediate access to the content, the PDF download of this standard presents selected graphics in color for enhanced readability.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | ASHRAE Guideline 1.3-2018 <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | CONTENTS <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | 1. PURPOSE 2. SCOPE 3. UTILIZATION 4. DEFINITIONS <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | 5. INTENT OF COMMISSIONING (CX) PROCESS TRAINING 6. PREDESIGN PHASE <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | 7. DESIGN PHASE <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 8. CONSTRUCTION PHASE <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 9. OCCUPANCY AND OPERATIONS PHASE <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 10. ONGOING COMMISSIONING (OCX) PROCESS 11. EXISTING BUILDINGS\u2014OTHER THAN ONGOING COMMISSIONING 12. REFERENCES <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | INFORMATIVE ANNEX A\u2014TRAINING FLOWCHART <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | INFORMATIVE ANNEX B\u2014TRAINING DOCUMENTATION AND VERIFICATION MATRIX <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | INFORMATIVE ANNEX C\u2014GENERAL TRAINING RESOURCES <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | INFORMATIVE ANNEX D\u2014NEEDS ASSESSMENT STRUCTURE <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | Table D-1 Predesign Phase Training Expectations Matrix <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | Table D-2 Design Phase Training Expectations Matrix <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | INFORMATIVE ANNEX E\u2014TRAINING IN THE OWNER’S PROJECT REQUIREMENTS (OPR) <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | INFORMATIVE ANNEX F\u2014TRAINING PLAN <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | INFORMATIVE ANNEX G\u2014BUDGETING FOR TRAINING <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | INFORMATIVE ANNEX H\u2014TRAINING INSTRUCTOR QUALIFICATIONS <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | INFORMATIVE ANNEX I\u2014GENERAL TRAINING SPECIFICATIONS <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | INFORMATIVE ANNEX J\u2014TRAINING CHECKLISTS <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | Table J-1 Training Types Checklist <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | Table J-2 Logistics Checklist <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | Table J-3 Verification Checklist <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | INFORMATIVE ANNEX K\u2014TRAINING EFFECTIVENESS QUESTIONNAIRE <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | INFORMATIVE ANNEX L\u2014TRAINING BEST PRACTICES <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | INFORMATIVE ANNEX M\u2014TRAINING AGENDA <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | INFORMATIVE ANNEX N\u2014CROSS REFERENCES TO TRAINING REQUIREMENTS IN ASHRAE COMMISSIONING DOCUMENTS N1. Summary of References to Training In ASHRAE Guideline 0, The Commissioning Process <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | N2. SUMMARY OF REFERENCES TO TRAINING IN ASHRAE GUIDELINE 0.2, THE COMMISSIONING PROCESS FOR EXISTING BUILDING SYSTEMS AND ASSEMBLIES <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | N3. SUMMARY OF REFERENCES TO TRAINING IN ASHRAE GUIDELINE 1.1, HVAC&R TECHNICAL REQUIREMENTS FOR THE COMMISSIONING PROCESS <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | N4. SUMMARY OF REFERENCES TO TRAINING IN ASHRAE GUIDELINE 1.4, PROCEDURES FOR PREPARING FACILITY SYSTEMS MANUALS <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | N5. SUMMARY OF REFERENCES TO TRAINING IN ASHRAE GUIDELINE 1.5, THE COMMISSIONING PROCESS FOR SMOKE CONTROL SYSTEMS <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | N6. SUMMARY OF REFERENCES TO TRAINING IN ASHRAE STANDARD 202, COMMISSIONING PROCESS FOR BUILDINGS AND SYSTEMS <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" ASHRAE Guideline 1.3-2018 – Building Operations and Maintenance Training for the HVAC&R Commissioning Process<\/b><\/p>\n |