{"id":17615,"date":"2024-10-16T22:25:52","date_gmt":"2024-10-16T22:25:52","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/astm-e1699\/"},"modified":"2024-10-24T12:32:05","modified_gmt":"2024-10-24T12:32:05","slug":"astm-e1699","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/astm\/astm-e1699\/","title":{"rendered":"ASTM-E1699"},"content":{"rendered":"<\/p>\n
1.1 This practice covers a procedure for defining and satisfying the functions of a project.<\/p>\n
1.2 A multidisciplinary team uses the procedure to convert stakeholder constraints, needs, and desires into descriptions of project functions and then relates these functions to revenues and cost.<\/p>\n
1.3 Examples of costs are all relevant costs over a designated study period, including the costs of obtaining funds, designing, purchasing\/leasing, constructing\/installing, operating, maintaining, repairing, replacing and disposing of the particular building design or system (see Terminologies E631 and E833 ). While not the only criteria, cost is an important basis for comparison in a value analysis study of a project. Therefore, accurate and comprehensive cost data is an important element of the analysis.<\/p>\n
1.4 is a procedure to develop alternatives that meet the project’s functions. Estimate the costs for each alternative. Provide the owner\/user\/stakeholder with specific, technically accurate alternatives, appropriate to the stage of project development, which can be implemented. The owner\/user\/stakeholder selects the alternative(s) that best satisfies their constraints, needs and desires.<\/p>\n
1.5 this practice to an entire project or to any subsystem. The user\/owner\/stakeholder can utilize the VA procedure to select the element or scope of the project to be studied.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | Scope Referenced Documents Summary of Practice Significance and Use <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | VA Team Procedure <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | FIG. 1 <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | Keywords X1. REFERENCE MATERIAL <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" E1699-10 Standard Practice for Performing Value Analysis (VA) of Buildings and Building Systems and Other Constructed Projects <\/b><\/p>\n |