Shopping Cart

No products in the cart.

IEEE C57.13.5-2019(Redline)

$81.25

IEEE Standard for Performance and Test Requirements for Instrument Transformers of a Nominal System Voltage of 115 kV and Above (Redline)

Published By Publication Date Number of Pages
IEEE 2019 81
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. Weā€™re here to assist you 24/7.
Email:[email protected]

Revision Standard – Active. Single-phase instrument transformers of a nominal system voltage of 115 kV and above with capacitive insulation system for line-to-ground connection and for both indoor and outdoor application are discussed in this standard. This standard is intended for use as a supplement to IEEE Std C57.13-2016 and as a basis for performance and safety of equipment. Test sequences, criteria, methods, and documentation for the test are also described.

PDF Catalog

PDF Pages PDF Title
1 IEEE Std C57.13.5ā„¢-2019 Front cover
2 Title page
4 Important Notices and Disclaimers Concerning IEEE Standards Documents
7 Participants
9 Introduction
10 Contents
12 1.ā€‚Overview
1.1ā€‚Scope
1.2ā€‚Purpose
1.3ā€‚Word usage
13 2.ā€‚Normative references
3.ā€‚Definitions
15 4.ā€‚General
4.1ā€‚Insulation requirements
19 4.2ā€‚Mineral oil requirements
4.3ā€‚Requirements for accuracy and accuracy calibration systems
4.4ā€‚Mechanical performance requirements
21 4.5ā€‚Thermal performance requirements
4.6ā€‚Ground shield requirements
4.7ā€‚Dissolved gas and water content requirements for new oil-immersed transformers
22 4.8ā€‚Endurance capability for fast high voltage transient
4.9ā€‚Performance of internal arc protection
4.10ā€‚Identification of test sample in the type test report
4.11ā€‚Secondary short-circuit capability for voltage transformers
23 4.12ā€‚Relaying current transformers having an anti-remanence gap
4.13ā€‚Gas filling pressure and gas monitoring for gas-filled instrument transformers
5.ā€‚Test conditions
24 6.ā€‚Classification of tests
6.1ā€‚Routine tests and test sequences
27 6.2ā€‚Type tests and test sequences
30 6.3ā€‚Special tests
7.ā€‚Routine test procedures (applicable to instrument transformers)
7.1ā€‚Verification of terminal markings and polarity
7.2ā€‚Capacitance and dissipation factor test
7.3ā€‚Applied voltage test on secondary windings
31 7.4ā€‚Insulation resistance test on windings
7.5ā€‚Lightning impulse voltage test on the primary winding
32 7.6ā€‚Power frequency voltage withstand test
7.7ā€‚Partial discharge test
33 7.8ā€‚Dissolved gas and water content analysis for oil-immersed transformers (of a nominal system voltage of 345 kV and above)
7.9ā€‚Sealing test
7.10ā€‚Ground shield check
34 7.11ā€‚Tests on the mineral oil
7.12ā€‚Inspection and routine pressure test for enclosure of gas-filled instrument transformers
8.ā€‚Routine test procedures (applicable to current transformers)
8.1ā€‚Inter-turn over-voltage test
35 8.2ā€‚Accuracy test for the metering rated current transformers
8.3ā€‚Resistance measurement of relaying rated secondary windings
36 8.4ā€‚Performance characteristics of relaying current transformers
37 9.ā€‚Routine test procedures (applicable to voltage transformers)
9.1ā€‚Applied voltage test on the neutral terminal
9.2ā€‚Accuracy test
9.3ā€‚Excitation characteristics with respect to rated voltage factor
38 9.4ā€‚Resistance measurement of windings
10.ā€‚Type test procedures (applicable to instrument transformers)
10.1ā€‚Dissolved gas and water content analysis
10.2ā€‚Mechanical test
39 10.3ā€‚Lightning impulse voltage test on the primary winding
40 10.4ā€‚Switching impulse voltage test on the primary winding ā€“ wet
41 10.5ā€‚External radio influence voltage (RIV) test
10.6ā€‚Power frequency voltage withstand test ā€“ wet
10.7ā€‚Power frequency voltage withstand/partial discharge test – dry
42 10.8ā€‚Temperature rise test
44 10.9ā€‚Short-time mechanical and thermal rating test
45 10.10ā€‚Accuracy performance test
10.11ā€‚Creepage distance measurement
46 10.12ā€‚Leakage test at low temperature for gas-filled instrument transformers
10.13ā€‚Burst test on enclosure for gas-filled instrument transformers
11.ā€‚Type test procedure (applicable to current transformers)
11.1ā€‚Secondary open-circuit voltage withstand test
47 12.ā€‚Special test procedures
12.1ā€‚Endurance chopped wave test
48 12.2ā€‚Internal arc test
49 12.3ā€‚Seismic qualification
13.ā€‚Identification of test sample in the type test report
50 13.1ā€‚Document package related to transformer type
51 AnnexĀ A (normative) Test code
A.1ā€‚Temperature rise test
52 A.2ā€‚Leakage test at low temperature for gas-filled instrument transformers
53 A.3ā€‚Endurance chopped wave test
55 AnnexĀ B (normative) Validity of type test reports and guidance for reviewing the design comparison report for the modified design
B.1ā€‚Validity of type test reports
B.2ā€‚Guidance of reviewing the comparison report
57 AnnexĀ C (normative) Current transformers used for the detection of unbalance current of capacitor banks
C.1ā€‚General
C.2ā€‚Definition
C.3ā€‚General requirements
63 C.4ā€‚Specific requirements
68 AnnexĀ D (normative) Gas tightness
D.1ā€‚Specification
D.2ā€‚Testing
D.3ā€‚Cumulative test method and calibration procedure
72 D.4ā€‚Time between replenishments
73 AnnexĀ E (informative) Dielectric tests performed at an altitude of 1000 m or less for instrument transformers designed for installation at altitudes greater than 1000 m
74 AnnexĀ F (informative) Dielectric tests, oil sampling, and other related measurements in the field
75 AnnexĀ G (informative) Internal arc protection for instrument transformers
76 AnnexĀ H (informative) Rated voltage factor
77 AnnexĀ I (informative) Current transformers having transient performance requirements
78 AnnexĀ J (informative) Electrical endurance test, explanatory note
79 AnnexĀ K (informative) Bibliography
81 Back cover
IEEE C57.13.5-2019
$81.25