Shopping Cart

No products in the cart.

IEEE 2030.3 2016

$52.54

IEEE Standard Test Procedures for Electric Energy Storage Equipment and Systems for Electric Power Systems Applications

Published By Publication Date Number of Pages
IEEE 2016 72
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

New IEEE Standard – Active. Applications of electric energy storage equipment and systems (ESS) for electric power systems (EPSs) are covered. Testing items and procedures, including type test, production test, installation evaluation, commissioning test at site, and periodic test, are provided in order to verify whethere ESS applied in EPSs meet the safety and reliability requirements of the EPS. Grid operators, ESS manufactures, and ESS operators are for whom this standard is established.

PDF Catalog

PDF Pages PDF Title
1 IEEE Std 2030.3™-2016 Front cover
2 Title page
4 Important Notices and Disclaimers Concerning IEEE Standards Documents
7 Participants
8 Introduction
9 Contents
11 IMPORTANT NOTICE
Overview
1.1 Scope
12 1.2 Purpose
2. Normative references
13 3. Definitions
3.1 Definitions
3.2 Acronyms and abbreviations
14 4. General
4.1 Testing items
4.2 Application
16 5. General technical requirements
5.1 Accuracy of the test result
5.2 Test environment
5.3 Accuracy and calibration of the instruments for test
5.4 Equipment information
17 5.5 Test report
5.6 Technical requirement of the test system
6. Type tests
18 6.1 Temperature stability test
19 6.2 State of charge (SOC) test
22 6.3 Conversion efficiency test
27 6.4 Response time test
29 6.5 Ramp-rate test
30 6.6 Synchronization test
31 6.7 Reconnection after abnormal condition test
36 6.8 Harmonics test
37 6.9 Flicker test
6.10 Voltage unbalance test
39 6.11 Open-phase test
40 6.12 Overcurrent test
6.13 DC injection test
6.14 Response to abnormal voltage condition
48 6.15 Response to abnormal frequency condition
51 6.16 Unintentional islanding test
52 6.17 Low-voltage ride through test (LVRT test)
55 6.18 Interconnection integrity test
56 6.19 Test record
7. Production test
7.1 Insulation test of paralleling equipment
57 7.2 Synchronization test
7.3 Continuous operation test
7.4 Reconnection after abnormal condition test
58 7.5 Response to abnormal voltage condition test
59 7.6 Response to abnormal frequency condition test
7.7 Overcurrent test
7.8 Unintentional islanding test
60 7.9 Low-voltage ride through test
7.10 Test record
8. Installation evaluation
8.1 Operation environment conditions
61 8.2 Grounding
8.3 Isolation device
8.4 Monitoring
8.5 Fault response
8.6 Coordination with EPS reclosing
9. Commissioning test
9.1 General requirements
62 9.2 Calibration and inspection
9.3 Supplemented type test and production test at site
9.4 Insulation test of paralleling equipment
63 9.5 Synchronization test
9.6 Unintentional islanding test
9.7 Stop charging/discharging test
64 9.8 Parameters adjustment
10. Periodic test
65 Annex A (informative) Test signals
A.1 Magnitude test (ramp function)—general
67 A.2 Time test (step function)—general
70 Annex B (informative) Quality factor calculation method
B.1 Quality factor
71 Annex C (informative) Bibliography
72 Back cover
IEEE 2030.3 2016
$52.54