BSI PAS 2035/2030:2019, Online – 1 Licence
$130.16
Retrofitting dwellings for improved energy efficiency. Specification and guidance
Published By | Publication Date | Number of Pages |
BSI | 2019 | 194 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
3 | PAS2035_bookmarked |
6 | Foreword |
8 | 0 Introduction |
11 | 1 Scope |
13 | 2 Normative references |
15 | 3 Terms and definitions |
18 | 4 Guidance about retrofit building physics 4.1 Introduction 4.2 Building pathology 4.3 Thermal models and calculations |
20 | 5 Guidance about approaches to retrofit 5.1 Retrofit performance considerations, standards and constraints 5.2 Medium-term improvement plans |
21 | 5.3 Retrofit at scale 5.4 Fabric first |
22 | 5.5 Concentrate on the interfaces 5.6 Retrofit advice |
23 | 6 Requirements for retrofit coordination and risk management 6.1 Retrofit Coordinator 6.2 Establishing intended outcomes |
24 | 7 Requirements for retrofit risk assessments 7.1 Risk assessment process 7.2 Consequences of the outcome of the risk assessment 7.3 Repeating the risk assessment |
25 | 8 Requirements for whole-dwelling assessments 8.1 The purpose of the assessment 8.2 The Retrofit Assessor 8.3 Assessment: Path A 8.4 Assessment: Path B |
26 | 8.5 Assessment: Path C 8.6 Reporting the assessment and handing over assessment data |
28 | 9 Requirements for retrofit designs 9.1 Design: Path A |
30 | 9.2 Design: Path B |
32 | 9.3 Design: Path C |
33 | 10 Requirements for installation of retrofit designs |
34 | 11 Requirements for testing and commissioning 11.1 Requirements for testing 11.2 Requirements for commissioning 11.3 Test certificates and commissioning records |
35 | 12 Requirements for handover 12.1 Specification of handover requirements 12.2 Handover recipients |
36 | 13 Requirements for retrofit advice 13.1 Qualifications for Retrofit Advisors 13.2 Delivery of retrofit advice 13.3 Retrofit advice: Path A |
37 | 13.4 Retrofit advice: Paths B and C |
38 | 14 Requirements for monitoring and evaluation 14.1 The purpose of monitoring and evaluation 14.2 Retrofit Evaluator 14.3 Levels of monitoring and evaluation 14.4 Basic monitoring and evaluation |
39 | 14.5 Intermediate monitoring and evaluation 14.6 Advanced monitoring and evaluation |
40 | 15 Claims of compliance 15.1 General 15.2 Basis of claim 15.3 Permitted forms of disclosure |
41 | 16 References 16.1 Retrofit framework standards |
43 | 16.2 List of references (other than formal standards, for guidance only) |
44 | Annex A (Normative) Qualifications |
47 | Annex B (Normative) Risk Assessments |
51 | Annex C (Normative) Requirements for provision of adequate ventilation |
56 | Annex D (Normative) Requirements for dealing with interactions between EEMs |
58 | Bibliography |
63 | PAS2030_bookmarked |
65 | Contents |
67 | Foreword |
69 | Introduction |
71 | 1 Scope |
72 | 2 Normative references |
74 | 3 Terms and definitions |
77 | 4 Retrofit project management |
78 | 5 The retrofit design 5.1 Installer responsibility to be in possession of a retrofit design 5.2 Validation of the retrofit design |
80 | 6 Installation process 6.1 Installation method statement 6.2 Installation equipment and tools |
81 | 6.3 Checking, handling and storage of materials and supplies 6.4 Provision of installation instructions to operatives 6.5 People |
82 | 6.6 Subcontract Installers 6.7 Testing 6.8 Commissioning 6.9 Handover |
83 | 6.10 Installation control 6.11 Installation documents and record keeping |
84 | 7 Installation process management 7.1 Operation and process oversight 7.2 Pre-installation building inspection |
85 | 7.3 Action in respect of intermediate inspection 7.4 Installation change 7.5 Process continuity plan |
86 | 7.6 Process control 7.7 Internal audit and corrective action 7.8 Installation process records 7.9 Business and financial probity |
87 | 8 Service provision 8.1 Complaints procedure 8.2 Complaints records 8.3 Interaction with clients |
88 | 9 Claims of compliance 9.1 Applicability of claims 9.2 Requirement to claim 9.3 Basis of claim |
89 | 10 Documents essential to the application of the Annexes of this PAS 10.1 Use of the identified documents 10.2 Publicly Available Specification and British Standards |
91 | 10.3 Institution of Gas Engineer and Managers – Standards 10.4 Energy Networks Association Engineering Recommendations 10.5 UKLPG 10.6 Ministry of Housing, Communities and Local Government 10.7 Other insulation installation guidance references |
92 | Annex A (normative) Measure-specific Annex selection and co-installation requirements |
94 | A.3 Explanation of PAS 2030 measure-specific Annex referencing system Annex B (normative) BFM energy efficiency measures A.4 Interactions between EEMs |
96 | A.5 Avoidance of thermal bridging |
97 | Annex B (normative) BFM energy efficiency measures B.1 Measure BFM.1 Cavity wall insulation including that installed in party walls |
100 | B.2 Measure BFM.2 Draught proofing |
103 | B.3 Measure BFM.3 – Energy efficient glazing and doors including replacement Insulating Glass Units (IGU) |
106 | B.4 Measure BFM.4 – External wall insulation |
111 | B.5 Measure BFM.5 Flat roof insulation |
114 | B.6 Measure BFM.6 Floor insulation |
117 | B.7 Measure BFM 7 Hybrid wall insulation |
122 | B.8 Measure BFM.8 Internal wall insulation |
127 | B.9 Measure BFM.9 Loft insulation |
130 | B.10 Measure BFM.10 Pitched roof insulation |
133 | B.11 Measure BFM.11: Solar Blinds, Shutters and Shading Devices (internal and external). |
136 | B.12 Measure BFM.12: Room-in-roof insulation |
138 | B.13 Measure BFM.13: Insulation of existing park homes |
141 | Annex C (normative) BSM energy efficiency measures C.1 Measure BSM.1 Condensing boilers, natural gas-fired and liquefied petroleum gas-fired |
144 | C.2 Measure BSM.2 Oil-fired condensing boilers |
147 | C.3 Measure BSM.3 Flue-gas heat recovery devices |
149 | C.4 Measure BSM.4: Heating system insulation (ducting, pipes and cylinders) |
151 | C.5 Measure BSM.5 Heating, hot water system, air conditioning or ventilation controls and components |
154 | C.6 Measure BSM.6 Hot water systems |
157 | C.7 BSM.8 Mechanical Ventilation with Heat Recovery |
160 | C.8 Measure BSM.8 Under-floor heating |
163 | C.9 Measure BSM.9 Warm-air heating systems |
166 | C.10 BSM.10 Water efficient taps and showers |
168 | Annex D (normative) BSE energy efficiency measures D.1 Measure BSE.1 Electric storage heaters (including electric warm air heating units that incorporate heat storage) |
171 | D.2 Measure BSE.2 Lighting fittings, lighting systems and lighting system controls |
174 | Annex E (informative) PAS 2030:2017 to PAS 2030:2019 – Substantive change |
177 | Annex F (informative) Installer guidance on the use and application of PAS 2030:2019 F.1 Overview F.2 A staged approach to installation |
179 | Annex G (informative) Example installation project information collation form G.1 Use of this form G.2 Location of installation G.3 Measure(s) to be installed |
180 | G.4 Source of PAS 2035 compliant design (5.1) G.5 Validation of design (5.2) |
181 | G.6 Products and/or system specified/ to be installed G.7 Installation method statement |
182 | G.8 Installation process |
185 | G.9 Operation and process oversight G.10 Pre-installation building inspection |
187 | G.11 Provision for any intermediate inspection required (7.3) G.12 Installation change (7.4) G.13 Process continuity (7.5) G.14 Process control records (7.6 & 7.8) |
188 | G.15 Details of any problems encountered during installation, corrections agreed and remedial work undertaken G.16 Client complaints (8) |
189 | G.17 Commissioning – EEM performance testing carried out G.18 Record of information left with Client at handover G.19 Installation sign-off |
190 | Bibliography |