BS ISO 8528-6:2023 – TC
$280.87
Tracked Changes. Reciprocating internal combustion engine driven alternating current generating sets – Test methods
Published By | Publication Date | Number of Pages |
BSI | 2023 | 151 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | 30482697 |
77 | A-30450619 |
78 | National foreword |
83 | Foreword |
85 | 1 Scope 2 Normative references |
86 | 3 Terms, definitions and abbreviations 3.1 Terms and definitions |
91 | 3.2 Abbreviated terms 4 Other regulations and additional requirements |
92 | 5 General test requirements 5.1 General |
93 | 5.2 Measurement equipment accuracy |
94 | 6 Functional test 6.1 General 6.1.1 General 6.1.2 Physical functional test 6.1.3 Functional test by simulation 6.2 General inspection |
95 | 6.3 Measurements 6.4 Functional test report |
96 | 7 Type test 7.1 General 7.2 Testing conditions |
97 | 7.3 Characterisation of performance class 7.3.1 Steady state verification at constant power |
98 | 7.3.2 Verification of power-sharing capability 7.3.3 Step load test |
100 | 7.3.4 Start and stop time characteristics |
101 | 7.4 Reactive power capability 7.4.1 General 7.4.2 Verification of reactive power capability |
104 | 7.4.3 Test method for verification of reactive power capability control methods |
108 | 7.5 Verification of grid synchronization limits 7.5.1 General 7.5.2 Testing method for verification of grid synchronisation limits |
109 | 7.6 Test method for verification of FRT capability 7.6.1 General 7.6.2 Aim of the test 7.6.3 Documents to be provided before test |
110 | 7.6.4 Test method |
111 | 7.6.5 Acceptance criteria 7.7 Test method for verification of active power response to frequency variation 7.7.1 General 7.7.2 Aim of the test |
112 | 7.7.3 Documents to be provided before test 7.7.4 Test method |
113 | 7.7.5 Acceptance criteria 7.8 Test method for verification of generating set protections 7.8.1 General 7.8.2 Verification of generating set disconnection time from the grid |
114 | 7.8.3 Verification of protection limits |
115 | 8 Simulation-method-based assessment 8.1 General |
116 | 8.2 Specification of model blocks 8.2.1 General 8.2.2 Engine and engine controller or governor block |
117 | 8.2.3 AC generator block 8.2.4 Generating set controller block 8.2.5 Excitation controller (AVR) block 8.2.6 Exciter block 8.2.7 Protective devices block |
118 | 8.2.8 Measurement transformer (if applicable) 8.3 Simulation for ISO performance class in standalone island operation 8.3.1 General 8.3.2 Model validation for standalone island mode |
120 | 8.4 Simulation for generating sets used in grid connected applications 8.4.1 General 8.4.2 Requirements and methodologies for model validation |
121 | 8.4.3 Model validation for different grid requirements |
125 | 8.5 Assessment for generating set family 8.5.1 Methodology 8.5.2 Assessment for ISO performance class for family 8.5.3 Assessment for type test for family in grid parallel application |
126 | 9 Acceptance test 9.1 General 9.2 Responsibility 9.3 Preparation 9.3.1 Provision of auxiliary personnel, test equipment and operating materials |
127 | 9.3.2 Acceptance test preparation at the installation site 9.3.3 Acceptance test preparation at the manufacturer’s site or facility 9.3.4 Preliminary safety checks on generating set prior to testing 9.4 Further details |
128 | 9.5 Extent of acceptance test 9.5.1 General 9.5.2 Checks (C) |
129 | 9.5.3 Measurements (M) |
130 | 9.6 Accuracy of measurement equipment and acceptance test procedure 9.6.1 Measurement equipment accuracy 9.6.2 Warm-up time |
131 | 9.6.3 Generating set load test duration 9.6.4 Performing acceptance tests at the manufacturer’s works 9.6.5 Installation site acceptance test |
132 | 9.7 Acceptance test report 9.7.1 General 9.7.2 General data |
134 | 9.7.3 Additional measured data for acceptance test |
135 | Annex A (informative) Test method using OVRT/UVRT test equipment |
142 | Annex B (informative) Test method for frequency ride through requirements |
147 | Annex C (informative) Example load step test report |
149 | Bibliography |