BS 5839-9:2021 – TC
$280.87
Tracked Changes. Fire detection and fire alarm systems for buildings – Code of practice for the design, installation, commissioning and maintenance of emergency voice communication systems
Published By | Publication Date | Number of Pages |
BSI | 2021 | 160 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | 30443156 |
89 | A-30416720 |
93 | Foreword |
95 | Introduction |
96 | Section 1: General 1 Scope 2 Normative references |
97 | 3 Terms and definitions |
100 | 4 Need for an emergency voice communication system |
101 | 5 Exchange of information and definition of responsibilities |
102 | 6 Variations from the recommendations of this British Standard |
103 | Section 2: Design considerations 7 Purpose |
104 | 8 System circuitry and software |
105 | 9 Audio and data signal paths |
106 | 10 Fault monitoring and indication 10.1 Fault conditions |
107 | 10.2 Fault indications |
108 | 10.3 Audible fault warning 10.4 Resetting from the fault warning condition 10.5 Monitoring of software-controlled equipment 10.6 Monitoring of memory contents |
109 | 10.7 System integrity 11 Outstations 11.1 General |
110 | 11.2 Controls 11.3 Indications |
111 | 11.4 Electrical performance 11.5 Mechanical details |
112 | 11.6 Location |
114 | 11.7 Audio frequency induction loop systems Figure 1 — Measuring field strength – plan view |
115 | Figure 2 — Measuring field strength – side view 12 Master stations 12.1 General |
117 | 12.2 Controls |
118 | 12.3 Indicators |
119 | 12.4 Electrical performance |
120 | 12.5 Mechanical construction 12.6 Location |
121 | 13 Power supplies |
122 | 13.1 Recommendations for low voltage mains power supplies |
123 | 13.2 Recommendations for EVC system power supply units |
124 | 14 Cables, wiring and other interconnections |
126 | 15 Wireless-linked EVC systems |
129 | 16 Environmental conditions |
130 | 17 Electromagnetic compatibility 18 Electrical safety |
132 | Section 3: Installation 19 Responsibilities of the installer 20 Installation practices and workmanship |
133 | 21 Testing of wiring |
135 | Section 4: Commissioning and handover 22 Commissioning |
136 | 23 Documentation |
137 | 24 Certification |
138 | 25 Acceptance |
139 | 26 Verification 27 Training |
141 | Section 5: Maintenance 28 Routine testing 28.1 Recommendations for weekly testing by the user 28.2 Recommendations for monthly attention by the user |
142 | 29 Inspection and servicing 29.1 Recommendations for quarterly inspection of a vented battery 29.2 Recommendations for six-monthly inspection and test of the system |
143 | 30 Non-routine attention |
146 | Section 6: User responsibilities 31 Premises management 32 Logbook |
147 | Annex A (informative) Explanation of access level |
148 | Annex B (normative) Method for calculating standby battery capacity |
149 | Annex C (normative) Modified subclauses from BS EN 54-2:1997+A1 |
151 | Annex D (informative) Model certificates |
159 | Bibliography |