Shopping Cart

No products in the cart.

ASCE Pipelines2008 2008

$59.58

Pipelines 2008 – Pipeline Asset Management, Maximizing Performance of our Pipeline Infrastructure

Published By Publication Date Number of Pages
ASCE 2008 1342
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This collection contains 135 papers presented at the ASCE International Pipelines Conference, held in Atlanta, Georgia, July 22-27, 2008. Sponsored by the Pipeline Division of ASCE.

PDF Catalog

PDF Pages PDF Title
1 Cover
6 Table of Contents
Planning, Design, and Construction (Renewal)
18 Session A1
Bridge the San Joaquin River—One Challenge in 37 Mile Pipeline
27 Buckling of Unconfined and Confined Thin-Walled Steel Cylinders under External Pressure
37 Field Measurement and Numerical Analysis for Buried Large Diameter Steel Pipes
47 Pre-Construction Drillability Assessment for Horizontal Directional Drilling in Rock
57 Session A2
Implementing Water Main Renovation
69 Submerge Pipeline under the Karun River by Artificial Intelligence Design of Spinal Cords Behavior and Physical Model
79 Subsurface Utility Engineering for Highway Construction
89 Session A3
A Proactive Approach to the Rehabilitation of an Aging Brick Sewer Infrastructure in Newark, New Jersey
99 Seismic Design of Bell-and-Spigot Joints for Large Diameter Steel Pipe
111 Trenchless Technology Applied to Degraded Gravity Concrete Outfall Sewer to Avoid Collapse
117 Session A4
Developing Predictable Cost Curves for Urban Transmission Projects
126 Selecting the Best Pipeline Route Based on Facts Not Feelings
135 Fusible Polyvinylchloride Pipe in Municipal Applications: A Canadian Perspective
145 Session A5
A Happy Ending after Eight Catastrophic Failures: Wichita Falls’ Experience with Condition Assessment
152 Longitudinal Stresses in Pressure Pipeline Design—A Critical Review
164 Stockton Delta Water Project Pipeline Design Challenges
174 Session A6
Axial Joint Design for Welded Buried Steel Pipe
184 Design and Construction of Large Diameter Pipelines at a Major Southern California Water Treatment Facility
194 Leak Induced Settlement of Buried Pipelines in Collapsible Soil
204 Session A7
Changes to North American PVC Pressure Pipe Standards
214 Flowable Fill and the Ridges Basin Inlet Conduit
224 Pipe Thrust Restraint in Treatment Plant Applications
234 Session A8
Installation of Gravity Sewers Using Horizontal Directional Drilling (HDD)
244 Lateral Pipe Bursting Focus for Inflow and Infiltration in Sanitary Sewer Systems
250 Ultrasonic Inspection System for Wastewater Concrete Pipes
260 Session B1
A Discussion of E’ versus Depth
270 Research on Detection to Long Distance and Super Deep Pipeline Installed by HDD
278 Subsurface Utility Engineering: A Technology-Driven Process That Results in Increased Safety, Fewer Design Changes, and Lower Costs
285 Utility Asset Management through a Joint-Use Pipeline Network for Cables
294 Session B2
Design of a 120 in.-Diameter Steel Bifurcation with a Small Acute Angle for a High- Pressure Penstock
304 Probabilistic Soil-Structure Interaction Model for Pipe-Jacking Force Analysis
314 Shaking Table Experiments on Lightweight Thrust Restraint for Buried Bend
324 Session B3
Horizontal Directional Drilling—Sharing an Inaugural Experience
336 Pipeline Asset Management: Initial Investigative Foray into the Las Vegas Valley Water District (LVVWD) Steel Pipeline System
348 Lessons Learned from Pomerado Pipeline 4 Rehabilitation
358 Planning, Design, and Construction (New Construction)
Session B4
Ponce de Leon Combined Sewer System Separation Planning, Design, and Construction
369 Potholing from a Contractor’s Perspective
378 The Design and Performance of Pressure Pipe Liners under Static and Cyclic Loading
388 Session B5
Best Practices for Owner QA and QC Procedures for Large Diameter Pipelines
399 Full Scale Test Installation for Reinforced Concrete Pipe
409 Utilizing Horizontal Directional Drilling to Deal with Deep Scour and Severe Environmental Restrictions in a 1700-Foot River Crossing
419 Session B6
Fabrication of Welded Steel Wye Branches
434 Planning for Regional Water Supply Needs in Florida through an Integrated Loop Pipeline System
444 The City of Atlanta: Microtunneling Projects Using Vitrified Clay Jacking Pipe
454 Session B7
Design and Construction of the St. Rose Sanitary Sewer Phase I: Henderson, Nevada
464 NCPI/NYC Research Project—An Evaluation of Four Bedding Systems
478 Bringing Carbon Fiber Lining Design and Practices to the Next Level
487 Session B8
Guaranteeing Zero Leakage on a New 20 Mile Pipeline: TRWD’s 350 MGD Eagle Mountain Connection Project
498 How a Small Agency Manages a Mega Pipeline Project—A Success Story
508 New Thrust Restraint Technique Using Geosynthetics for Buried Bend
520 Asset Management, Risks, and Inspection
Session C1
An Integrated Management Approach for Critical Water Mains
530 Innovation by Evolution: Modern Techniques for Integral Pipe Joint Design
540 U.S.-China Collaborative Research Directions on Trenchless Technology and Critical Underground Infrastructure Issues
551 Wavy Imperfections and the Strength of Cast-in-Place Pressure Pipe Liners
561 Session C2
A Lifetime Prediction Methodology for a Comprehensive Pipeline Risk Management System
572 Experimental Investigation of Stress-Strain State of the Thin-Walled Steel Pipe Subjected to Combined Loads
583 Session C3
Asset Management Applied to Trenchless Sewer Repair (Life Cycle Cost Impact on Property Tax)
591 Evaluation of an Un-Tethered Free-Swimming Acoustic Leak Detection Technology
601 Integration of Geographic Information System and Probabilistic Analysis for Optimized Pipe Infrastructure Decisions
613 Session C4
Digital Pipeline Image Scanning and Intelligent Data Management for Sewer Pipelines
624 Scattergraph Principles and Practice: Evaluating Pump Stations, Inverted Siphons, and Other Related Structures
632 Spatial Analysis Using GIS to Study Performance of Highway Culvers in Ohio
642 Session C5
Assessing Pipe Condition and Risk in Portland, Oregon’s Distribution System
652 Managing Risk to Groundwater Wells during Pump Station and Pipeline Construction—The Walnut Lake Project
662 Modeling of Stress Corrosion Cracking in Plastic Pipes
672 Session C6
Asset Management and Nondestructive Evaluation of Force Mains in New York City
683 City of Rochester, NY Conduit Planning Study: Rush Reservoir to City Reservoirs
693 NACE International Water and Wastewater Advisory Council
697 Session C7
Achieving a More Complete View of the Subsurface with 3D Underground Imaging
707 Practical Asset Management and Monitoring Saves Millions on Problematic 60″ and 96″ PCCP Mains
715 Trenchless Renewal of Culverts and Storm Sewers
723 Hydraulic Design
Session D1
Developing a Closing Rule Curve for Valves in Pipelines to Control the Water Hammer Impacts: Application of the NSGA-II Optimization Model
733 Field Data for the Calibration of a Hydraulic Model
745 Step by Step Evaluation of Hydrofracture Risks for Horizontal Directional Drilling Projects
755 Transient Pressure Monitoring in El Paso
764 Session D2
Clustered Models for the Integration of Sewer Condition Classification Protocols
775 Seismic Vulnerability of a Natural Gas Pipeline Network
785 Transient Control for a Multiple Booster Pumping Station and Transmission Pipeline System—Design, Testing, Adjustment, and Operation
795 Session D3
Assessing Performance of a Water Transmission System Using an Inverse Transient Method
803 Hydraulic Transient Considerations in Conceptual Design
811 The Lake Marion Regional Water System: Planning a Regional Water System to Spur Economic Development
820 Session D4
“Carpet Center of the World” Is Guaranteed a Long Term Water Supply
826 Optimization of Water Tanks Size and Location on Networks
837 When Modeling Isn’t Enough
844 Session D5
City of Phoenix Superior Pipeline PCCP Investigation and Assessment
852 Settlement Prediction and FEM Analysis of Culvert Section under High-Filled Embankment
861 The Importance of Valves to Asset Management and Pipeline Performance
869 Session D6
Design of a New Parallel Lake Water Intake for the Champlain Water District in South Burlington, Vermont
880 Planning: Key to Minimizing Impacts to the Texas Medical Center
890 Private Property Virtual Library: Helping to Connect Useful Resources to Those Who Need It
896 Session D7
A Field Study of HDD Installed Ductile Iron Pipe
906 City of Phoenix Superior Pipeline PCCP Failure and Emergency Repair
911 Water Loss Levels from Transmission Mains in Urban Environments
921 Durability, Operation, Maintenance
Session E1
An Independent Evaluation of the Effectiveness of Polyethylene Encasement as a Corrosion Control Measure for Ductile Iron Pipe
928 Assessing Sanitary Sewer Systems through Basin Characterization
937 Evaluating Alternative Alignments and Maximizing Existing Sewer Capacities Results in Cost Savings for Sewer Improvements at the Design Level
945 Municipal Infrastructure Capital Improvement Planning—A Software Based Solution Better Than the Etch A Sketch
951 Session E2
Inspection, Failure Risk Analysis, and Repair of Cooling-Water Lines in One Outage
961 Minimising Streetworks Disruption by Mapping the Underworld
973 Rehab—Not Just for Celebrities Anymore: Optimizing Sewer Pipeline Rehab through a Unique Approach
982 Session E3
Polyethylene Encasement as an Asset Preservation Method for Ductile Iron Pipe
992 Safe Work Practice and Equipment Required for the Successful Rehabilitation of PCCP Using a Carbon Fiber Reinforced Polymer (CFRP) Strengthening System
1002 San Jose Trunk Sewer Inspection and Assessment
1012 Session E4
An Empirical Model for the Prediction of Structural Behavior of Wastewater Collection Systems
1024 Applications of Non-Destructive Evaluation (NDE) in Pipeline Inspection
1034 Welding Considerations for Stainless Steel Pipe
1041 Session E5
Condition Assessment of a 66-Inch Diameter PCCP Raw Water Transmission Main
1053 Inline CCTV Inspections of In-Service Pressurized Water Mains
1063 Wastewater Asset Management at the City of Edmonton, Alberta
1073 Session E6
Effect of Over-Insertion and Over-Deflection on the Integrity of PVC Pressure Pipe: Numerical and Experimental Analysis
1083 Instrumentation of a Section of AC Pipe in Expansive Soil
1093 Pipeline Condition Assessment by Physical Evaluation
1101 Session E7
Collection System Improvements to Effectively Reduce SSOs
1114 Plastic Pipeliner Long-Term Design: How to Accommodate Creep
1128 Future, Corrosion, Education, and Case Studies
Session F1
Analysis of Delay Causes for Pipeline Projects in Sewage System: Taiwan Cases
1138 Cost of Underground Infrastructure Renewal: A Comparison of Open-Cut and Trenchless Methods
1149 Impact of Hurricanes on Buried Infrastructure Networks—A Case History
1162 Trenchless Installation of Restrained-Joint PVC Wastewater Pipe in Broomfield Colorado County Park
1171 Session F2
AC Enigma: Using Opportunistic Sampling to Assess Asbestos-Cement Water Main Performance in Winnipeg
1181 Evaluation of Alternative Alignments and Maximizing Existing Sewer Capacities at the Master Plan Level: Cost Savings for Sewer Improvements Are Achieved
1191 Scattergraph Principles and Practice: Peeling the Onion—Evaluating the Accuracy of Flow Monitor Data
1199 Session F3
Addressing Construction Issues Resulting from a Contractor’s Bankruptcy Declaration
1207 Quality Control of Carbon Fiber Composite System Repairs of PCCP from the Inspector’s Viewpoint
1217 Use of Native Soil in Place of Aggregate in Controlled Low Strength Material (CLSM)
1230 Session F4
Large Diameter HDD Pipe Installations and HDD Assist Techniques
1238 Lessons Learned from Failure of a Large Diameter Water Pipeline
1250 The Present Conditions and Sustainability of Underground Infrastructure Asset Management in Mainland China
1258 Session F5
Development of PCCP Wire Breaks Prediction Model Using Artificial Neural Networks
1269 Pipe Vision: Condition Based Assessment of a South Florida Sewage Force Main
1290 The Pursuit of Infiltration and Inflow Reduction Case Study Documents Quantifiable Success
1300 Session F6
Lessons Learned from a 66-Inch PCCP Break in San Diego
1309 Pipe Selection for Transient Control and Energy Savings
1316 Session F7
GIS Applications for Spatial Analysis of Water Distribution Pipeline Breakage and Condition Assessment Data
1326 Insights Gained from October 2006 Failure of the Homestake Pipeline
1336 Pipelines and Light Rail Transit: A Pipeline Owner’s Guide to Stray Current
ASCE Pipelines2008 2008
$59.58