{"id":125587,"date":"2024-10-19T05:09:21","date_gmt":"2024-10-19T05:09:21","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-1017-1-2021-2\/"},"modified":"2024-10-24T23:15:52","modified_gmt":"2024-10-24T23:15:52","slug":"ieee-1017-1-2021-2","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-1017-1-2021-2\/","title":{"rendered":"IEEE 1017.1-2021"},"content":{"rendered":"
Revision Standard – Active. Procedures and test voltage values for factory, acceptance, and maintenance testing of electric submersible pump (ESP) cable systems are presented. This recommended practice applies to cable systems rated 3 kV through 8 kV (phase to phase) and is intended only for this special purpose cable. The intent is to provide uniform test procedures and guidelines for evaluation of the test results.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | IEEE Std 1017.1-2021 Front cover <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | Title page <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | Important Notices and Disclaimers Concerning IEEE Standards Documents <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Participants <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 1.\u2002Overview 1.1\u2002Background <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 1.2\u2002Scope 1.3\u2002Purpose 1.4\u2002Word usage 2.\u2002Normative references <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 3.\u2002Definitions, acronyms, and abbreviations 3.1\u2002Definitions <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 3.2\u2002Acronyms and abbreviations <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 4.\u2002Safety 4.1\u2002Description 4.2\u2002Application 4.3\u2002Procedures to secure cable test area <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 5.\u2002General considerations 5.1\u2002Environmental influences 5.2\u2002Cable storage 5.3\u2002Equipment maintenance <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 5.4\u2002Tests covered by the recommended practice 5.5\u2002Additional test equipment <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 6.\u2002DC hi-pot test methods 6.1\u2002Overview <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 6.2\u2002Precautions 6.3\u2002DC high potential tester (hi-pot) 6.4\u2002Equipment setup <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 6.5\u2002Procedures <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 6.6\u2002Evaluation of dc hi-pot test results <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | 7.\u2002Conductor resistance and continuity tests <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 8.\u2002Finished armored cable factory tests 8.1\u2002DC withstand test <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | 8.2\u2002AC withstand test 8.3\u2002DC test conductance leakage readings 9.\u2002Mechanical integrity of armored cable 10.\u2002Mechanical\/chemical testing of nonlead metallic barrier cables with encapsulating jacket 10.1\u2002Cold bend <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 10.2\u2002Abrasion resistance <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 10.3\u2002Tear resistance <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | 11.\u2002Effect of chemical exposure on tensile, yield, and elongation 11.1\u2002Purpose 11.2\u2002Test specimen 11.3\u2002Alternative test specimen 11.4\u2002Chemical exposure conditions <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | 11.5\u2002Chemical compatibility with well fluids (optional) 11.6\u2002Cold impact test 11.7\u2002Stripability\/removal 12.\u2002Partial discharge (PD) testing 12.1\u2002Overview <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | 12.2\u2002Precautions 12.3\u2002Procedures <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | 12.4\u2002Interpretation of results <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | 13.\u2002Very low frequency\/tan-delta (VLF\/TD) testing 13.1\u2002Overview 13.2\u2002Precautions 13.3\u2002VLF\/Tan-delta test equipment <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | 13.4\u2002Equipment setup 13.5\u2002Procedures <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | 13.6\u2002Evaluation of VLF-TD results <\/td>\n<\/tr>\n | ||||||
57<\/td>\n | 14.\u2002Testing of surface feedthroughs and connections 14.1\u2002Description 14.2\u2002Environment <\/td>\n<\/tr>\n | ||||||
59<\/td>\n | 14.3\u2002Wellhead with pack-off (no connections at wellhead) 14.4\u2002Wellhead with connections <\/td>\n<\/tr>\n | ||||||
60<\/td>\n | 14.5\u2002Visual Inspection <\/td>\n<\/tr>\n | ||||||
61<\/td>\n | 14.6\u2002Procedure for testing of potheads (motor connectors) <\/td>\n<\/tr>\n | ||||||
62<\/td>\n | 14.7\u2002Testing of wellhead penetrators <\/td>\n<\/tr>\n | ||||||
65<\/td>\n | Annex\u00a0A (informative) Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Recommended Practice for Testing of Electric Submersible Pump Cable (Redline)<\/b><\/p>\n |