{"id":125587,"date":"2024-10-19T05:09:21","date_gmt":"2024-10-19T05:09:21","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-1017-1-2021-2\/"},"modified":"2024-10-24T23:15:52","modified_gmt":"2024-10-24T23:15:52","slug":"ieee-1017-1-2021-2","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-1017-1-2021-2\/","title":{"rendered":"IEEE 1017.1-2021"},"content":{"rendered":"

Revision Standard – Active. Procedures and test voltage values for factory, acceptance, and maintenance testing of electric submersible pump (ESP) cable systems are presented. This recommended practice applies to cable systems rated 3 kV through 8 kV (phase to phase) and is intended only for this special purpose cable. The intent is to provide uniform test procedures and guidelines for evaluation of the test results.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\nIEEE Std 1017.1-2021 Front cover <\/td>\n<\/tr>\n
2<\/td>\nTitle page <\/td>\n<\/tr>\n
4<\/td>\nImportant Notices and Disclaimers Concerning IEEE Standards Documents <\/td>\n<\/tr>\n
7<\/td>\nParticipants <\/td>\n<\/tr>\n
8<\/td>\nIntroduction <\/td>\n<\/tr>\n
10<\/td>\nContents <\/td>\n<\/tr>\n
12<\/td>\n1.\u2002Overview
1.1\u2002Background <\/td>\n<\/tr>\n
13<\/td>\n1.2\u2002Scope
1.3\u2002Purpose
1.4\u2002Word usage
2.\u2002Normative references <\/td>\n<\/tr>\n
14<\/td>\n3.\u2002Definitions, acronyms, and abbreviations
3.1\u2002Definitions <\/td>\n<\/tr>\n
16<\/td>\n3.2\u2002Acronyms and abbreviations <\/td>\n<\/tr>\n
18<\/td>\n4.\u2002Safety
4.1\u2002Description
4.2\u2002Application
4.3\u2002Procedures to secure cable test area <\/td>\n<\/tr>\n
19<\/td>\n5.\u2002General considerations
5.1\u2002Environmental influences
5.2\u2002Cable storage
5.3\u2002Equipment maintenance <\/td>\n<\/tr>\n
20<\/td>\n5.4\u2002Tests covered by the recommended practice
5.5\u2002Additional test equipment <\/td>\n<\/tr>\n
21<\/td>\n6.\u2002DC hi-pot test methods
6.1\u2002Overview <\/td>\n<\/tr>\n
22<\/td>\n6.2\u2002Precautions
6.3\u2002DC high potential tester (hi-pot)
6.4\u2002Equipment setup <\/td>\n<\/tr>\n
23<\/td>\n6.5\u2002Procedures <\/td>\n<\/tr>\n
25<\/td>\n6.6\u2002Evaluation of dc hi-pot test results <\/td>\n<\/tr>\n
33<\/td>\n7.\u2002Conductor resistance and continuity tests <\/td>\n<\/tr>\n
34<\/td>\n8.\u2002Finished armored cable factory tests
8.1\u2002DC withstand test <\/td>\n<\/tr>\n
35<\/td>\n8.2\u2002AC withstand test
8.3\u2002DC test conductance leakage readings
9.\u2002Mechanical integrity of armored cable
10.\u2002Mechanical\/chemical testing of nonlead metallic barrier cables with encapsulating jacket
10.1\u2002Cold bend <\/td>\n<\/tr>\n
36<\/td>\n10.2\u2002Abrasion resistance <\/td>\n<\/tr>\n
37<\/td>\n10.3\u2002Tear resistance <\/td>\n<\/tr>\n
39<\/td>\n11.\u2002Effect of chemical exposure on tensile, yield, and elongation
11.1\u2002Purpose
11.2\u2002Test specimen
11.3\u2002Alternative test specimen
11.4\u2002Chemical exposure conditions <\/td>\n<\/tr>\n
42<\/td>\n11.5\u2002Chemical compatibility with well fluids (optional)
11.6\u2002Cold impact test
11.7\u2002Stripability\/removal
12.\u2002Partial discharge (PD) testing
12.1\u2002Overview <\/td>\n<\/tr>\n
43<\/td>\n12.2\u2002Precautions
12.3\u2002Procedures <\/td>\n<\/tr>\n
45<\/td>\n12.4\u2002Interpretation of results <\/td>\n<\/tr>\n
46<\/td>\n13.\u2002Very low frequency\/tan-delta (VLF\/TD) testing
13.1\u2002Overview
13.2\u2002Precautions
13.3\u2002VLF\/Tan-delta test equipment <\/td>\n<\/tr>\n
47<\/td>\n13.4\u2002Equipment setup
13.5\u2002Procedures <\/td>\n<\/tr>\n
48<\/td>\n13.6\u2002Evaluation of VLF-TD results <\/td>\n<\/tr>\n
57<\/td>\n14.\u2002Testing of surface feedthroughs and connections
14.1\u2002Description
14.2\u2002Environment <\/td>\n<\/tr>\n
59<\/td>\n14.3\u2002Wellhead with pack-off (no connections at wellhead)
14.4\u2002Wellhead with connections <\/td>\n<\/tr>\n
60<\/td>\n14.5\u2002Visual Inspection <\/td>\n<\/tr>\n
61<\/td>\n14.6\u2002Procedure for testing of potheads (motor connectors) <\/td>\n<\/tr>\n
62<\/td>\n14.7\u2002Testing of wellhead penetrators <\/td>\n<\/tr>\n
65<\/td>\nAnnex\u00a0A (informative) Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

IEEE Recommended Practice for Testing of Electric Submersible Pump Cable (Redline)<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
IEEE<\/b><\/a><\/td>\n2021<\/td>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":125588,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2644],"product_tag":[],"class_list":{"0":"post-125587","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-ieee","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/125587","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/125588"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=125587"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=125587"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=125587"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}