{"id":122026,"date":"2024-10-19T04:32:52","date_gmt":"2024-10-19T04:32:52","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/2007-ashrae-handbook-hvac-applications-chapter17\/"},"modified":"2024-10-24T22:57:58","modified_gmt":"2024-10-24T22:57:58","slug":"2007-ashrae-handbook-hvac-applications-chapter17","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ashrae\/2007-ashrae-handbook-hvac-applications-chapter17\/","title":{"rendered":"2007 ASHRAE Handbook HVAC Applications Chapter17"},"content":{"rendered":"

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\nDesign Criteria
Design Criteria
Overview
Overview
Environmental Specifications
Environmental Specifications <\/td>\n<\/tr>\n
3<\/td>\nTemperature
Temperature
Temperature Rate of Change
Temperature Rate of Change
Humidity
Humidity
Filtration and Contamination
Filtration and Contamination <\/td>\n<\/tr>\n
4<\/td>\nVentilation
Ventilation
Envelope Considerations
Envelope Considerations
Human Comfort
Human Comfort
Flexibility
Flexibility
Acoustics
Acoustics
Vibration Isolation and Seismic Restraint
Vibration Isolation and Seismic Restraint
HVAC Load Considerations
HVAC Load Considerations <\/td>\n<\/tr>\n
5<\/td>\nDatacom Equipment
Datacom Equipment
Load Considerations and Challenges
Load Considerations and Challenges
Ventilation and Infiltration
Ventilation and Infiltration
Electrical Equipment
Electrical Equipment <\/td>\n<\/tr>\n
6<\/td>\nLights
Lights
People
People
Building Envelope
Building Envelope
Heating and Reheat
Heating and Reheat
Humidification
Humidification
High-Density Loads
High-Density Loads
HVAC Systems and Components
HVAC Systems and Components
Computer Room Air-Conditioning (CRAC) Units
Computer Room Air-Conditioning (CRAC) Units <\/td>\n<\/tr>\n
7<\/td>\nCentral-Station Air-Handling Units
Central-Station Air-Handling Units
Chilled-Water Distribution Systems
Chilled-Water Distribution Systems <\/td>\n<\/tr>\n
8<\/td>\nCondenser Systems
Condenser Systems
Air-Conditioning Systems
Air-Conditioning Systems
Chillers
Chillers
Pumps
Pumps
Piping
Piping
Humidifiers
Humidifiers
Controls and Monitoring
Controls and Monitoring <\/td>\n<\/tr>\n
9<\/td>\nAir Distribution
Air Distribution
Equipment Placement and Airflow Patterns
Equipment Placement and Airflow Patterns <\/td>\n<\/tr>\n
11<\/td>\nUnderfloor Plenum Supply
Underfloor Plenum Supply <\/td>\n<\/tr>\n
12<\/td>\nOverhead and Ceiling Plenum Supply
Overhead and Ceiling Plenum Supply
Return Air
Return Air
Computational Fluid Dynamics Simulation
Computational Fluid Dynamics Simulation <\/td>\n<\/tr>\n
13<\/td>\nAncillary Spaces
Ancillary Spaces
Electrical Power Distribution and Conditioning Rooms
Electrical Power Distribution and Conditioning Rooms
Battery Rooms
Battery Rooms
Engine\/Generator Rooms
Engine\/Generator Rooms
Burn-In Rooms and Test Labs
Burn-In Rooms and Test Labs
Datacom Equipment Spare Parts
Datacom Equipment Spare Parts
Storage Spaces
Storage Spaces <\/td>\n<\/tr>\n
14<\/td>\nOther Systems and Considerations
Other Systems and Considerations
Fire Suppression
Fire Suppression
Commissioning
Commissioning
Serviceability
Serviceability
Availability and Redundancy
Availability and Redundancy <\/td>\n<\/tr>\n
15<\/td>\nEnergy Conservation
Energy Conservation
References
References
Codes, Standards, and Guidelines
Codes, Standards, and Guidelines <\/td>\n<\/tr>\n
16<\/td>\nOther Publications
Other Publications
Bibliography
Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

HVAC Applications Handbook – Chapter 17. Data Processing and Electronic Office Areas<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
ASHRAE<\/b><\/a><\/td>\n2007<\/td>\n16<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":122027,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2719],"product_tag":[],"class_list":{"0":"post-122026","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-ashrae","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/122026","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/122027"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=122026"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=122026"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=122026"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}