BSI PAS 59:2004
$56.18
Filled collective fall arrest systems
Published By | Publication Date | Number of Pages |
BSI | 2004 | 12 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | PUBLICLY AVAILABLE SPECIFICATION |
3 | Contents |
5 | Introduction 1 Scope 2 Normative references 3 Terms and definitions 3.1 filled collective fall arrest system 3.2 impact attenuation 3.3 free fall height |
6 | 3.4 ignitability 4 Requirements 4.1 Designation 4.2 Design 4.3 Construction 4.4 Dynamic performance 4.5 Environmental performance 4.6 Ignitability |
7 | 4.7 Instructions for use and maintenance 4.8 Warning labels |
8 | 4.9 Quality control 4.10 Conformity marking Figure 1 Pictogram used to denote “Read the information supplied by the manufacturer” |
9 | Annex A (normative) Method of test A.1 General A.2 Principle A.3 Test facility A.4 Test specimen A.5 Apparatus A.5.1 Drop weight A.5.2 Accelerometer A.5.3 Impact measuring and recording instrumentation A.5.4 Quick release device A.6 Test procedure A.6.1 Install the test specimen in accordance with the manufacturer’s instructions [ A.6.2 Raise the drop weight over the installed configuration of cushioning mats such that the underside… A.6.3 Let the drop weight fall and record the time/acceleration curve during the arrest stage. A.6.4 Repeat A.6.5 At the discretion of the test house (e.g. if the covering of the cushioning mat is of a smooth, ‘… |
10 | A.7 Calculation of results A.8 Test report |