Shopping Cart

No products in the cart.

ASHRAE 180 08:2008 Edition

$16.79

ASHRAE Standard 180-2008 Standard Practice for Inspection and Maintenance of Commercial Building HVAC Systems (ANSI/ASHRAE/ACCA Approved)

Published By Publication Date Number of Pages
ASHRAE 2008 26
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

PDF Catalog

PDF Pages PDF Title
4 FOREWORD
FOREWORD
1. PURPOSE
1. PURPOSE
2. SCOPE
2. SCOPE
2.1 This standard provides minimum requirements for the HVAC system inspection and maintenance practice in new and existing buildings. Where specifically noted in this standard, different requirements apply.
2.1 This standard provides minimum requirements for the HVAC system inspection and maintenance practice in new and existing buildings. Where specifically noted in this standard, different requirements apply.
2.2 The provisions of this standard do not apply to:
2.2 The provisions of this standard do not apply to:
2.3 This standard shall not be used to circumvent any safety, health, or environmental requirements.
2.3 This standard shall not be used to circumvent any safety, health, or environmental requirements.
3. DEFINITIONS
3. DEFINITIONS
5 4. Implementation
4. Implementation
4.1 Responsible Party. The building owner shall be responsible for meeting the requirements of this standard. The owner may designate other parties that shall be authorized and contractually obligated to fulfill the owner’s responsibility.
4.1 Responsible Party. The building owner shall be responsible for meeting the requirements of this standard. The owner may designate other parties that shall be authorized and contractually obligated to fulfill the owner’s responsibility.
4.2 Maintenance Program. Each HVAC system shall have a maintenance program that, at a minimum, preserves the condition of the HVAC system and its elements in a manner that enables the system to provide the intended thermal comfort and energy efficien…
4.2 Maintenance Program. Each HVAC system shall have a maintenance program that, at a minimum, preserves the condition of the HVAC system and its elements in a manner that enables the system to provide the intended thermal comfort and energy efficien…
6 4.3 Maintenance Plan Authorization and Execution. Inspection and maintenance tasks shall be performed on an established frequency or upon a documented observance of unacceptable condition. Whether authorized by written or verbal instructions, executi…
4.3 Maintenance Plan Authorization and Execution. Inspection and maintenance tasks shall be performed on an established frequency or upon a documented observance of unacceptable condition. Whether authorized by written or verbal instructions, executi…
4.4 Revision of the Maintenance Program
4.4 Revision of the Maintenance Program
5. REQUIRED INSPECTION AND MAINTENANCE TASKS
5. REQUIRED INSPECTION AND MAINTENANCE TASKS
20 INFORMATIVE APPENDIX A SOURCES OF PERFORMANCE OBJECTIVES
INFORMATIVE APPENDIX A SOURCES OF PERFORMANCE OBJECTIVES
Informative Appendix B Identifying Indicators of Unacceptable Conditions
Informative Appendix B Identifying Indicators of Unacceptable Conditions
Informative Appendix C Bibliography
Informative Appendix C Bibliography
ASHRAE 180 08
$16.79