ACI 506.2M 13:2014 Edition

$31.96

506.2M-13 Specification for Shotcrete (Metric), First Printing May 2014 – Errata as of 8/8/2017

Published By Publication Date Number of Pages
ACI 2014 16
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This specification contains the construction requirements for the application of shotcrete. Both wet- and dry-mixture shotcrete are addressed, as well as fiber-reinforced shotcrete. The minimum standard for materials, properties, testing, and application are covered. The materials, processes, quality control measures, and inspections described in this specification should be tested, monitored, or performed as applicable only by individuals holding the appropriate ACI certifications or equivalent. Keywords: dry-mixture shotcrete; fiber-reinforced shotcrete; nozzleman; qualification; quality control; quality assurance; shooting; wet-mixture shotcrete.

PDF Catalog

PDF Pages PDF Title
3 CONTENTS
CONTENTS
4 PART 1— GENERAL
PART 1— GENERAL
1.1—Scope
1.1—Scope
1.2—Definitions
1.2—Definitions
1.3—Referenced standards
1.3—Referenced standards
5 1.4—Submittals
1.4—Submittals
6 1.5—Preconstruction testing by Contractor
1.5—Preconstruction testing by Contractor
1.6—Testing during construction
1.6—Testing during construction
7 1.7—Delivery, storage, and handling
1.7—Delivery, storage, and handling
PART 2— PRODUCTS
PART 2— PRODUCTS
2.1—Materials
2.1—Materials
2.2—Packaged shotcrete materials
2.2—Packaged shotcrete materials
2.3—Fiber-reinforced shotcrete
2.3—Fiber-reinforced shotcrete
2.4—Shotcrete properties
2.4—Shotcrete properties
8 2.5—Proportioning
2.5—Proportioning
2.6—Batching, mixing, and delivery
2.6—Batching, mixing, and delivery
PART 3— EXECUTION
PART 3— EXECUTION
3.1—Preparation of surface to receive shotcrete
3.1—Preparation of surface to receive shotcrete
3.2—Joints
3.2—Joints
3.3—Alignment control
3.3—Alignment control
3.4—Application
3.4—Application
9 3.5—Finish
3.5—Finish
3.6—Curing
3.6—Curing
10 3.7—Protection
3.7—Protection
3.8—Tolerances
3.8—Tolerances
3.9—Repair of shotcrete
3.9—Repair of shotcrete
3.10—Acceptance of Work
3.10—Acceptance of Work
NOTES TO SPECIFIER
NOTES TO SPECIFIER
General notes
General notes
11 FOREWORD TO CHECKLISTS
FOREWORD TO CHECKLISTS
14 CHECKLIST REFERENCES
CHECKLIST REFERENCES
ACI 506.2M 13