ACI 506.2M 13:2014 Edition
$31.96
506.2M-13 Specification for Shotcrete (Metric), First Printing May 2014 – Errata as of 8/8/2017
Published By | Publication Date | Number of Pages |
ACI | 2014 | 16 |
This specification contains the construction requirements for the application of shotcrete. Both wet- and dry-mixture shotcrete are addressed, as well as fiber-reinforced shotcrete. The minimum standard for materials, properties, testing, and application are covered. The materials, processes, quality control measures, and inspections described in this specification should be tested, monitored, or performed as applicable only by individuals holding the appropriate ACI certifications or equivalent. Keywords: dry-mixture shotcrete; fiber-reinforced shotcrete; nozzleman; qualification; quality control; quality assurance; shooting; wet-mixture shotcrete.
PDF Catalog
PDF Pages | PDF Title |
---|---|
3 | CONTENTS CONTENTS |
4 | PART 1— GENERAL PART 1— GENERAL 1.1—Scope 1.1—Scope 1.2—Definitions 1.2—Definitions 1.3—Referenced standards 1.3—Referenced standards |
5 | 1.4—Submittals 1.4—Submittals |
6 | 1.5—Preconstruction testing by Contractor 1.5—Preconstruction testing by Contractor 1.6—Testing during construction 1.6—Testing during construction |
7 | 1.7—Delivery, storage, and handling 1.7—Delivery, storage, and handling PART 2— PRODUCTS PART 2— PRODUCTS 2.1—Materials 2.1—Materials 2.2—Packaged shotcrete materials 2.2—Packaged shotcrete materials 2.3—Fiber-reinforced shotcrete 2.3—Fiber-reinforced shotcrete 2.4—Shotcrete properties 2.4—Shotcrete properties |
8 | 2.5—Proportioning 2.5—Proportioning 2.6—Batching, mixing, and delivery 2.6—Batching, mixing, and delivery PART 3— EXECUTION PART 3— EXECUTION 3.1—Preparation of surface to receive shotcrete 3.1—Preparation of surface to receive shotcrete 3.2—Joints 3.2—Joints 3.3—Alignment control 3.3—Alignment control 3.4—Application 3.4—Application |
9 | 3.5—Finish 3.5—Finish 3.6—Curing 3.6—Curing |
10 | 3.7—Protection 3.7—Protection 3.8—Tolerances 3.8—Tolerances 3.9—Repair of shotcrete 3.9—Repair of shotcrete 3.10—Acceptance of Work 3.10—Acceptance of Work NOTES TO SPECIFIER NOTES TO SPECIFIER General notes General notes |
11 | FOREWORD TO CHECKLISTS FOREWORD TO CHECKLISTS |
14 | CHECKLIST REFERENCES CHECKLIST REFERENCES |