{"id":89316,"date":"2024-10-18T07:07:53","date_gmt":"2024-10-18T07:07:53","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/in-state-4-n-a\/"},"modified":"2024-10-24T20:23:02","modified_gmt":"2024-10-24T20:23:02","slug":"in-state-4-n-a","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/in\/in-state-4-n-a\/","title":{"rendered":"IN State 4 N\/A"},"content":{"rendered":"

None<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\nARTICLE 15. INDUSTRIALIZED BUILDING SYSTEMS
Rule 1. Special Administrative Rules for Industrialized Building Systems and Mobile Structures
675 IAC 15-1-1 Title; purpose; applicability; availability (Repealed)
675 IAC 15-1-2 Definitions (Repealed)
675 IAC 15-1-3 Alternate materials, methods, and designs (Repealed)
675 IAC 15-1-4 Undefined terms; interpretation of rules (Repealed)
675 IAC 15-1-5 Design release for manufacture; requirements (Repealed)
675 IAC 15-1-6 Applications (Repealed)
675 IAC 15-1-7 Plans; specifications; requirements (Repealed)
675 IAC 15-1-8 Table No. 1A (Repealed)
675 IAC 15-1-8.1 Table No. 1A (Repealed)
675 IAC 15-1-9 Reciprocity; agreements with other states (Repealed)
675 IAC 15-1-10 Enforcement; scope (Repealed)
675 IAC 15-1-11 Issuance of seal acceptance (Repealed)
675 IAC 15-1-12 Inspections; travel expenses; sanctions (Repealed) <\/td>\n<\/tr>\n
2<\/td>\n675 IAC 15-1-13 Stop work (Repealed)
675 IAC 15-1-14 Right of entry (Repealed)
675 IAC 15-1-15 Insurance (Repealed)
675 IAC 15-1-16 Manufacturer’s data plate (Repealed)
675 IAC 15-1-17 Relationships; state, manufacturers, third parties (Repealed)
675 IAC 15-1-18 Failure of completed industrialized building systems to comply (Repealed)
675 IAC 15-1-19 Third party inspection agency authorization; application (Repealed)
675 IAC 15-1-20 Third party inspection agency utilization (Repealed)
675 IAC 15-1-21 Sanctions concerning third party inspection agency authorizations (Repealed)
675 IAC 15-1-22 Fees (Repealed)
675 IAC 15-1-23 Third party inspection authorization fees (Repealed)
Rule 1.1. Title; Purpose; Applicability; Definitions <\/td>\n<\/tr>\n
3<\/td>\n675 IAC 15-1.1-1 Title; purpose; applicability
675 IAC 15-1.1-2 Definitions <\/td>\n<\/tr>\n
5<\/td>\nRule 1.2. Administrative Rules for Industrialized Building Systems and Mobile Structures
675 IAC 15-1.2-1 Scope
675 IAC 15-1.2-2 Design release for manufacture; requirements
675 IAC 15-1.2-3 Design release application requirements <\/td>\n<\/tr>\n
6<\/td>\n675 IAC 15-1.2-4 Signatories to design release application <\/td>\n<\/tr>\n
7<\/td>\n675 IAC 15-1.2-5 Plans; specifications; requirements. <\/td>\n<\/tr>\n
8<\/td>\n675 IAC 15-1.2-6 Applicable codes for design and construction <\/td>\n<\/tr>\n
9<\/td>\n675 IAC 15-1.2-7 Alternate materials, methods, and designs <\/td>\n<\/tr>\n
10<\/td>\n675 IAC 15-1.2-8 Design professional
675 IAC 15-1.2-9 Issuance of the design release <\/td>\n<\/tr>\n
11<\/td>\n675 IAC 15-1.2-10 Expiration of design release
675 IAC 15-1.2-11 Addenda to released system
675 IAC 15-1.2-12 Prototype <\/td>\n<\/tr>\n
12<\/td>\n675 IAC 15-1.2-13 Maintenance of design release; plans and specifications
675 IAC 15-1.2-14 Compliance with rules
675 IAC 15-1.2-15 Quality control program <\/td>\n<\/tr>\n
13<\/td>\n675 IAC 15-1.2-16 Manufacturer’s data plate
675 IAC 15-1.2-17 Responsibility; manufacturer <\/td>\n<\/tr>\n
14<\/td>\nRule 1.3. In-Plant Inspection Enforcement and Indiana Seal of Acceptance Affixed for Industrialized Building Systems and Mobile Structures
675 IAC 15-1.3-1 Purpose
675 IAC 15-1.3-2 Scope
675 IAC 15-1.3-3 Inspections; required
675 IAC 15-1.3-4 Inspections; procedure <\/td>\n<\/tr>\n
15<\/td>\n675 IAC 15-1.3-5 In-plant inspection; travel
675 IAC 15-1.3-6 Seal of acceptance; required
675 IAC 15-1.3-7 Seal of acceptance
675 IAC 15-1.3-8 Seal of acceptance; reporting use <\/td>\n<\/tr>\n
16<\/td>\n675 IAC 15-1.3-9 Seal of acceptance; affixed
675 IAC 15-1.3-10 Seal of acceptance; manufacturing ceasing production
675 IAC 15-1.3-11 Seal of acceptance; damaged or missing
675 IAC 15-1.3-12 Seal of acceptance; unaccounted
Rule 1.4. Certification of Industrialized Building Systems and Mobile Structures without Indiana Certification
675 IAC 15-1.4-1 Applicability <\/td>\n<\/tr>\n
17<\/td>\n675 IAC 15-1.4-2 Compliance with commission rules
675 IAC 15-1.4-3 Design release for certification; requirement
675 IAC 15-1.4-4 Application
675 IAC 15-1.4-5 Issuance of construction design release
675 IAC 15-1.4-6 In-plant inspection; required <\/td>\n<\/tr>\n
18<\/td>\n675 IAC 15-1.4-7 Quality control program
675 IAC 15-1.4-8 Data plate <\/td>\n<\/tr>\n
19<\/td>\n675 IAC 15-1.4-9 Seal of acceptance
Rule 1.5. Third Party Inspection Agency Authorization
675 IAC 15-1.5-1 Purpose; applicability
675 IAC 15-1.5-2 Application process <\/td>\n<\/tr>\n
20<\/td>\n675 IAC 15-1.5-3 Qualifications
675 IAC 15-1.5-4 Conflict of interest
675 IAC 15-1.5-5 Third party inspection agency; approval process <\/td>\n<\/tr>\n
21<\/td>\n675 IAC 15-1.5-6 Third party inspection agency; renewal of authorization
Rule 1.6. Schedule of Fees for Industrialized Building Systems and Mobile Structures
675 IAC 15-1.6-1 General
675 IAC 15-1.6-2 Construction design release fees <\/td>\n<\/tr>\n
22<\/td>\n675 IAC 15-1.6-3 Penalty fees
675 IAC 15-1.6-4 Prototype fees <\/td>\n<\/tr>\n
23<\/td>\n675 IAC 15-1.6-5 Inspection fee
675 IAC 15-1.6-6 Seal of acceptance fee
675 IAC 15-1.6-7 Third party inspection agency authorization fees
675 IAC 15-1.6-8 Third party inspection agency audit fees
675 IAC 15-1.6-9 Mileage fee
675 IAC 15-1.6-10 Travel fee <\/td>\n<\/tr>\n
24<\/td>\n675 IAC 15-1.6-11 Returned check fee
Rule 1.7. Sanctions Regarding Design Release, Seals of Acceptance and Third Party Inspection Agencies
675 IAC 15-1.7-1 Purpose
675 IAC 15-1.7-2 Sanctions; design release <\/td>\n<\/tr>\n
25<\/td>\n675 IAC 15-1.7-3 Sanctions; seal of acceptance
675 IAC 15-1.7-4 Sanctions; third party inspection agency
Rule 2. Indiana Mobile Structures Code <\/td>\n<\/tr>\n
26<\/td>\n675 IAC 15-2-1 Title, classification, availability, and applicability of rule
675 IAC 15-2-2 Definitions <\/td>\n<\/tr>\n
27<\/td>\n675 IAC 15-2-3 Source of design and construction standards
675 IAC 15-2-4 Scope of design and construction standards
675 IAC 15-2-5 Basic principles of design and construction
675 IAC 15-2-6 Definitions for design and construction <\/td>\n<\/tr>\n
28<\/td>\n675 IAC 15-2-7 General design and construction requirements
675 IAC 15-2-8 Design dead loads <\/td>\n<\/tr>\n
29<\/td>\n675 IAC 15-2-9 Design live loads
675 IAC 15-2-10 Wind, roof, and snow loads <\/td>\n<\/tr>\n
30<\/td>\n675 IAC 15-2-11 Fastening of structural systems
675 IAC 15-2-12 Walls
675 IAC 15-2-13 Floors <\/td>\n<\/tr>\n
31<\/td>\n675 IAC 15-2-14 Design load deflection
675 IAC 15-2-15 Structural load tests
675 IAC 15-2-16 Weather resistance
675 IAC 15-2-17 Condensation resistance for residential systems <\/td>\n<\/tr>\n
32<\/td>\n675 IAC 15-2-18 Interior walls, partitions, and ceilings
675 IAC 15-2-19 Rodent resistance
675 IAC 15-2-20 Heat loss; mobile system <\/td>\n<\/tr>\n
33<\/td>\n675 IAC 15-2-21 Design considerations
675 IAC 15-2-22 Ceiling height <\/td>\n<\/tr>\n
34<\/td>\n675 IAC 15-2-23 Exits
675 IAC 15-2-24 Room and hallway sizes <\/td>\n<\/tr>\n
35<\/td>\n675 IAC 15-2-25 Glass and glazed openings
675 IAC 15-2-26 Smoke detectors
675 IAC 15-2-27 Smoke detector locations
675 IAC 15-2-28 Alarm sounding devices
675 IAC 15-2-29 Detector trouble signals <\/td>\n<\/tr>\n
36<\/td>\n675 IAC 15-2-30 Testing detectors
675 IAC 15-2-31 In-transit design requirements <\/td>\n<\/tr>\n
37<\/td>\n675 IAC 15-2-32 Scope of plumbing standards <\/td>\n<\/tr>\n
38<\/td>\n675 IAC 15-2-33 Basic principles of plumbing standards
675 IAC 15-2-34 Definitions for plumbing standards <\/td>\n<\/tr>\n
40<\/td>\n675 IAC 15-2-35 General plumbing requirements <\/td>\n<\/tr>\n
41<\/td>\n675 IAC 15-2-36 Protection of plumbing system
675 IAC 15-2-37 Material standards
675 IAC 15-2-38 Joints and connections <\/td>\n<\/tr>\n
42<\/td>\n675 IAC 15-2-39 Traps <\/td>\n<\/tr>\n
43<\/td>\n675 IAC 15-2-40 Cleanouts
675 IAC 15-2-41 Fixtures and connections <\/td>\n<\/tr>\n
44<\/td>\n675 IAC 15-2-42 Toilets; shower compartments; dishwashers; washing machines <\/td>\n<\/tr>\n
45<\/td>\n675 IAC 15-2-43 Installation of fixtures
675 IAC 15-2-44 Piping strains and stresses
675 IAC 15-2-45 Piping supports
675 IAC 15-2-46 Hangers and anchors <\/td>\n<\/tr>\n
46<\/td>\n675 IAC 15-2-47 Water supply piping; hot water supply system
675 IAC 15-2-48 Water connections and outlets <\/td>\n<\/tr>\n
47<\/td>\n675 IAC 15-2-49 Water heaters; relief valves; prohibited location
675 IAC 15-2-50 Material standards for water piping and fittings
675 IAC 15-2-51 Installation of piping <\/td>\n<\/tr>\n
48<\/td>\n675 IAC 15-2-52 Size of water supply piping
675 IAC 15-2-53 Drainage systems; materials <\/td>\n<\/tr>\n
49<\/td>\n675 IAC 15-2-54 Drain outlets
675 IAC 15-2-55 Drain connections
675 IAC 15-2-56 Size of drainage piping <\/td>\n<\/tr>\n
50<\/td>\n675 IAC 15-2-57 Wet-vented drainage system
675 IAC 15-2-58 Offsets and branch fittings
675 IAC 15-2-59 Grade of horizontal drainage piping <\/td>\n<\/tr>\n
51<\/td>\n675 IAC 15-2-60 Vent piping and fittings
675 IAC 15-2-61 Material standards for vent piping and fittings
675 IAC 15-2-62 Size of vent piping <\/td>\n<\/tr>\n
52<\/td>\n675 IAC 15-2-63 Anti-siphon trap vent
675 IAC 15-2-64 Horizontal vent connections and grade
675 IAC 15-2-65 Vent terminal <\/td>\n<\/tr>\n
53<\/td>\n675 IAC 15-2-66 Vent caps
675 IAC 15-2-67 Water pressure tests
675 IAC 15-2-68 Waste and vent system tests <\/td>\n<\/tr>\n
54<\/td>\n675 IAC 15-2-69 Fixture tests
675 IAC 15-2-70 Shower compartment tests
675 IAC 15-2-71 Scope of heating, cooling, and fuel-burning system standards
675 IAC 15-2-72 Definitions for heating, cooling, and fuel-burning systems <\/td>\n<\/tr>\n
56<\/td>\n675 IAC 15-2-73 LP-gas systems; service line pressure
675 IAC 15-2-74 LP-gas containers <\/td>\n<\/tr>\n
57<\/td>\n675 IAC 15-2-75 Oil tanks <\/td>\n<\/tr>\n
58<\/td>\n675 IAC 15-2-76 Gas piping systems <\/td>\n<\/tr>\n
61<\/td>\n675 IAC 15-2-77 Oil piping systems <\/td>\n<\/tr>\n
62<\/td>\n675 IAC 15-2-78 General appliance standards <\/td>\n<\/tr>\n
63<\/td>\n675 IAC 15-2-79 Gas clothes dryers
675 IAC 15-2-80 Installation of appliances <\/td>\n<\/tr>\n
65<\/td>\n675 IAC 15-2-81 Venting and combustion air systems
675 IAC 15-2-82 Operating instructions <\/td>\n<\/tr>\n
66<\/td>\n675 IAC 15-2-83 Appliance information
675 IAC 15-2-84 Access to appliances
675 IAC 15-2-85 Location of appliances
675 IAC 15-2-86 Clearances
675 IAC 15-2-87 Circulating air system <\/td>\n<\/tr>\n
68<\/td>\n675 IAC 15-2-88 Scope of electrical standards <\/td>\n<\/tr>\n
69<\/td>\n675 IAC 15-2-89 Definitions for electrical standards <\/td>\n<\/tr>\n
71<\/td>\n675 IAC 15-2-90 Power supply <\/td>\n<\/tr>\n
72<\/td>\n675 IAC 15-2-91 Disconnecting means and branch-circuit protective equipment <\/td>\n<\/tr>\n
73<\/td>\n675 IAC 15-2-92 Receptacle outlets <\/td>\n<\/tr>\n
74<\/td>\n675 IAC 15-2-93 Fixtures; appliances <\/td>\n<\/tr>\n
75<\/td>\n675 IAC 15-2-94 Wiring methods and materials <\/td>\n<\/tr>\n
76<\/td>\n675 IAC 15-2-95 Grounding
675 IAC 15-2-96 Insulated neutral
675 IAC 15-2-97 Equipment grounding <\/td>\n<\/tr>\n
77<\/td>\n675 IAC 15-2-98 Bonding of noncurrent-carrying metal parts
675 IAC 15-2-99 Electrical tests <\/td>\n<\/tr>\n
78<\/td>\n675 IAC 15-2-100 Load calculations <\/td>\n<\/tr>\n
79<\/td>\n675 IAC 15-2-101 Interconnection of multiple section mobile residential structures <\/td>\n<\/tr>\n
80<\/td>\n675 IAC 15-2-102 Outdoor fixtures, outlets, and appliances
675 IAC 15-2-103 Painting of wiring
675 IAC 15-2-104 Polarization <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Indiana Administrative Code – Title 675 Fire Prevention and Building Safety Commission, Article 15 Industrialized Building Systems<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
IN<\/b><\/a><\/td>\nN\/A<\/td>\n81<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":89317,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2779],"product_tag":[],"class_list":{"0":"post-89316","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-in","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/89316","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/89317"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=89316"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=89316"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=89316"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}